INSTALLATION AND CONNECTION MANUAL
MODELS A-xxx/B, A5-xxx/B, AB-xxx/B, AB5-xxx/B,
AP-xxx/B, AP5-xxx/B, ABP-xxx/B and ABP5-xxx/B
WARNING: Any work on or near energized metering equipment can present
a danger of electrical shock. All work on these products should be performed
only by qualifi ed industrial electricians and metering specialists in accordance
with local utility safety practices and procedures outlined in the Handbook for
Electricity Metering (available from the Edison Electric Institute, 1111 19th
St. NW, Washington, DC 20036). The Information contained within this book is
intended to be an aid to qualifi ed metering personnel. It is not intended to replace
the extensive training necessary to install or remove meters from service.
7004-00054-A Rev A.indd
for
INTELLIMETER
Page 1 of 11
®
4242 REYNOLDS DRIVE * HILLIARD, OHIO * 43026-1264
PHONE: (614) 777-1005 * FAX: (614) 777-4511
800-853-2537 WWW.OSC-INTELLIMETER.COM
6/6/11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INTELLIMETER A/B Series and is the answer not in the manual?

Questions and answers

Summary of Contents for OSC INTELLIMETER A/B Series

  • Page 1 It is not intended to replace the extensive training necessary to install or remove meters from service. 4242 REYNOLDS DRIVE * HILLIARD, OHIO * 43026-1264 PHONE: (614) 777-1005 * FAX: (614) 777-4511 800-853-2537 WWW.OSC-INTELLIMETER.COM 7004-00054-A Rev A.indd Page 1 of 11 6/6/11...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS INTRODUCTION .........................3 INSTALLATION AND CONNECTION INSTRUCTIONS ..............4 INSTALLATION AND CONNECTION INSTRUCTIONS, cont’d..........5 PULSE OUTPUT CONNECTIONS .....................6 INPUT AND OUTPUT CONNECTORS (Connector Pin-outs) .............7 LOAD CONNECTIONS (Single-Load Meters)................8 LOAD CONNECTIONS (Two-Load Meters) ................9 PC BOARD ASSEMBLY ......................10 MAINTENANCE ........................
  • Page 3: Introduction

    INTRODUCTION The Intellimeter models A, A5, AB, AB5, R2 and PM2 are components of a system designed to measure electrical energy and communicate the measurements to a Central Station using powerline carrier signals over the power lines. AP, AP5, ABP and ABP5 are similar except they have pulse output only without the powerline carrier.
  • Page 4: Installation And Connection Instructions

    INSTALLATION AND CONNECTION INSTRUCTIONS Working clearances should comply with NEC Article 110-16. If not, take corrective action. The Intellimeter is intended for indoor use only. Do not install in damp or wet location. Wire bending space should be in compliance with NEC Article 373-6. Verify that current transformer (CT), potential tap and wiring can be installed without crowding subpanel.
  • Page 5: Installation And Connection Instructions, Cont'd

    INSTALLATION AND CONNECTION INSTRUCTIONS, cont’d. Turn off all breakers in cabinet. Check all loads for voltage. Disconnect power to subpanel. Have temporary lighting at hand, if required. Remove feeders from lugs and place feeder cables through current transformers with current fl...
  • Page 6: Pulse Output Connections

    PULSE OUTPUT CONNECTIONS The Intellimeter provides a KYZ output pulse for both the A dial and B dial kiloWatthours. These pulses can be used for load profi le or demand side management. Each output is a solid-state, Form C, contact rated at 350V peak and 0.120A maximum. The A-dial and B-dial pulses are output on PL1 and PL2, respectively.
  • Page 7: Input And Output Connectors (Connector Pin-Outs)

    INPUT AND OUTPUT CONNECTORS (Connector Pin-outs) Dwg# 0902-00690-B Rev B 7004-00054-A Rev A.indd Page 7 of 11 6/6/11...
  • Page 8: Load Connections (Single-Load Meters)

    LOAD CONNECTIONS (Single-Load Meters) Dwg# 0902-00690-B Rev B 7004-00054-A Rev A.indd Page 8 of 11 6/6/11...
  • Page 9: Load Connections (Two-Load Meters)

    LOAD CONNECTIONS (Two-Load Meters) Dwg# 0902-00690-B Rev B 7004-00054-A Rev A.indd Page 9 of 11 6/6/11...
  • Page 10: Pc Board Assembly

    PC BOARD ASSEMBLY Dwg# 0902-00690-B Rev B 7004-00054-A Rev A.indd Page 10 of 11 6/6/11...
  • Page 11: Maintenance

    MAINTENANCE Routine Maintenance There are no required maintenance operations for the Intellimeters. However, qualifi ed personnel may wish to perform an annual inspection of wiring connections. Cleaning The meters are not suitable for hose-down cleaning. Use only a damp cloth to remove dust or dirt from the outside of the enclosure.