It is vitally important that you and each and every person who is to utilize the Sky Climber® product, take the time to learn the proper and safe methods relating to utilization of the Sky Climber®...
Training, manuals and other documentation are available • Safety helmets should be worn at all times when at Sky Climber®. Do not hesitate to contact us for more servicing, (dis-) assembling or using the equipment. details.
® KY CLIMBER Environment Consider and control the specific risks related to certain environments and nature of the job. Increase inspection accord- ingly. Group Category Condition Temp. Applications Inspection Normal > 0°C/32 F Inspections, light maintenance, window washing.
KY CLIMBER Sky Stage Ultra® with End Stirrup configurations Sky Stage Ultra® is a modular work platform. All compo- A rigid structure is formed by attaching sections to nents are welded out of high quality aluminum. The connecting frames with connecting pins.
Sky Stage Ultra® with End Stirrup: side view. Sky Stage Ultra® with End Stirrups: front view. Item Dimension Description Platform Total length (L ) Suspension dist. (L ) ...
The following table can be used as check list when preparing standard configuration for transport. Conformance to the rated load capacities & configurations as shown in these tables is critical to the safe use of Sky Stage Ultra. Use of other configurations or greater weights could result in serious iniury.
2+3+3+3+2 42' 9" 3+2+3+3+3 45' 9" 3+3+3+3+3 48' 9" Note: Platform sections may not be used in configurations and lengths other than those shown in these tables. Contact Sky Climber® Engineering to discuss any variations. LEVER CANTILEVER CANTI ...
42' 9" 1190 3+2+3+3+3 45' 9" 3+3+3+3+3 48' 9" Note: Platform sections may not be used in configurations and lengths other than those shown in these tables. Contact Sky Climber® Engineering to discuss any variations. LEVER CANTI CANTILEVER ...
4 Connecting Pin assy's per Side Panel • Repeat step 1-4 for longer configuration. • To assemble multiple sections with ease: place end of platform on blocks. INSTALLATION INSTRUCTIONS UM•36•002 SKY STAGE ULTRA® ED•2019-12-04...
Page 12
Floor Panel Floor retaining Tabs should always be extended to prevent Floor Panel from lifting. INSTALLATION INSTRUCTIONS UM•36•002 SKY STAGE ULTRA® ED•2019-12-04...
Page 13
• You may now attach hoists and safety devices. • Installation shall be checked by a qualified person Note: Once suspended wall rollers can be repositioned from within platform. prior to use. INSTALLATION INSTRUCTIONS UM•36•002 SKY STAGE ULTRA® ED•2019-12-04...
Remove all load from platform: material and persons. the floor panel. Dereeve hoists. Reposition platform underneath new position of rigging system. Reeve hoists. Inspect installation prior to use. INSTALLATION INSTRUCTIONS UM•36•002 SKY STAGE ULTRA® ED•2019-12-04...
Verify if provisions are made to protect workers from falling objects above and below equipment. Verify if stirrups are in line with the roof supports. Always wear personal fall protection equipment. CHECK LISTS UM•36•002 SKY STAGE ULTRA® ED•2019-12-04...
Record of any incident and action taken. Dates of periodic inspection and record of outcome. Maintenance and repair records shall be kept in logbook. Always wear personal fall protection equipment. LOGBOOK UM•36•002 SKY STAGE ULTRA® ED•2019-12-04...
Need help?
Do you have a question about the SKY STAGE ULTRA and is the answer not in the manual?
Questions and answers