Chapter 5 Planning For Installation And Operation; User Responsibilities - Hitachi 9900 User And Reference Manual

A subsystem
Hide thumbs Also See for 9900:
Table of Contents

Advertisement

Chapter 5
Planning for Installation and Operation
This chapter provides information for planning and preparing a site before and during
installation of the Hitachi Lightning 9900™ subsystem. Please read this chapter carefully
before beginning your installation planning.
If you would like to use any of the Lightning 9900™ features or software products (e.g.,
TrueCopy, ShadowImage, HRX, Hitachi Graph-Track), please contact your Hitachi Data
Systems account team to obtain the appropriate license(s) and software license key(s).
Note: The general information in this chapter is provided to assist in installation planning
and is not intended to be complete. The DKC410 and DKC415 (9960/9910) installation and
maintenance documents used by Hitachi Data Systems personnel contain complete
specifications. The exact electrical power interfaces and requirements for each site must be
determined and verified to meet the applicable local regulations. For further information on
site preparation for Lightning 9900™ subsystem installation, please contact your Hitachi Data
Systems account team or the Hitachi Data Systems Support Center.
5.1

User Responsibilities

Before the 9900 subsystem arrives for installation, the user must provide the following items
to ensure proper installation and configuration:
Physical space necessary for proper subsystem function and maintenance activity
Electrical input power
Connectors and receptacles
Air conditioning
Floor ventilation areas (recommended but not required)
Cable access holes
RJ-11 analog phone line (for Hi-Track
®
support)
Hitachi Lightning 9900™ User and Reference Guide
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Freedom storage lightning 9900

Table of Contents