Samsung MXD-U000XN Installation Manual page 12

Ahu control unit (acu)
Hide thumbs Also See for MXD-U000XN:
Table of Contents

Advertisement

Installation
7
Set the DIP switches to fit the application requirements.
Scan the QR code attached to the front cover of the AHU
Control Unit (ACU) using a smartphone camera to use an
on-line system configuration wizard. For further information
about DIP switch settings, refer to the Option Setting on
page 25 to 30.
8
Pass the supplied cable tie through the wire organizer loop, secure the wires connected to the terminal blocks. Ensure that
the knot of the cable tie faces the side.
9
Align the front cover with the top of the AHU Control Unit
(ACU) body, and then close the front cover.
NOTE
After assembly, make sure that no wires are caught in the gap between the front and rear covers.
12 English
Cable tie
Wire
Use your
smartphone camera
to scan the QR code.
<Correct>
<Incorrect>
Ensure that the knot
of the cable tie faces to
the side.
01
02

Advertisement

Table of Contents
loading

Table of Contents