3‑12LOADINGANDUNLOADINGTHEMACHINE
*SetthetravelspeedselectswitchtoLOWbeforeIoadingthemachine.
NEVERoperatethisswitchwhen[oadingthemachineonatrailer.
*ChooseasflatgroundaspossibleforIoadingorun[oadingthemachine.
士Whenusingbadingramps,besurethereisadequateiength,width,
firmnessandslope.
*Topreventthemachinefromslippingwhileloading,orshiftingintransit,
removeice,snoworotherslipperymaterialfromthe[oadingdockandthe
truckbedbeforebading.
魯Performwarm-upbeforeIoadingandunloadingundercoldweather.
*NEVERmakeatumontheloadingramps.Tomakeatum,getoftthe
machinefromthebadinglampfirst.
1.Bbckthetrai]erwheeIsbeforeIoading.
2.InstalHheloadingIampstothetraiIer
secure[y.
3.Maintaintheslopeofbadingramps
within15degrees.
4,Thebodyhasbwercompietelyand
positiontheoperatorstationtoforward.
5.Positionthemachinesothatitcanbe
runstraightontheloadlngramps.Never
operatecontrolIeversotherthanthe
trave口overwhilethemachineisonthe
Ioadingramps.
6.Maintainthemachinebalancepoint
whi]etravelingovertheioadingramp
jointareas.
口○○
BlockMax」5Loadingboard
degrees
OPERATlON
7.Movethegatelocklevertothe
LOCKEDposition.
8.TumtheenginestartswitchkeytoOFF
tostoptheengineandremovethekey.
9、Lockthedoor,accesscoversand
attachanyvandalismprotection.
10.Blockthetracksandsecurethe
machinewithtiedowns.Forthis
purpose,withproperratedwirerope
cable,usethefrontandreareyeson
theIowerframeandtowingeyes
IocatedinfrontandrearoftheIower
frame.
BIock
3‑28
Block
Padding
Wirerope