Download Print this page

Victorian Plumbing Brooklyn Dot GS014X7BT Installation Instructions

Battery powered mirrors

Advertisement

Quick Links

INSTALLATION INSTRUCTIONS FOR
BATTERY POWERED MIRRORS
Before installing this product pay special attention to these instructions. It is
recommended that this product is installed by a qualified electrician to IEE wiring
regulations (BS 7671) and current building regulations. These products can safely be
fitted into Zone 2. See lighting regulations diagram.
Battery mirrors are powered by 8 AAA battery. On the bottom of mirror is a handle knob
to pull out the battery box which stores the batteries. To change or insert battery kindly
follow the instructions mentioned in installation steps 4 in following page.
Make sure the mirror is powered off before replacing/inserting batteries.
Don't mix old & new batteries together. This can damage the product.
Cleaning Instructions
In order to maintain the quality finish of this product please do not use any abrasives or
solvents when cleaning this product. Use only a damp cloth for cleaning this product.
Do not allow water to stand on any part of the mirror.
Please clean any spillage that may affect the quality of the finish as described above.
Special Care
Care Should be exercised when cleaning this product. Although its finish is extremely
durable, it can be damaged by harsh abrasives and cleaning pads. To clean, use a light,
non-abrasive cleaning solution or cleaning polish.
V1.10.2022

Advertisement

loading
Need help?

Need help?

Do you have a question about the Brooklyn Dot GS014X7BT and is the answer not in the manual?

Questions and answers

Summary of Contents for Victorian Plumbing Brooklyn Dot GS014X7BT

  • Page 1 INSTALLATION INSTRUCTIONS FOR BATTERY POWERED MIRRORS Before installing this product pay special attention to these instructions. It is recommended that this product is installed by a qualified electrician to IEE wiring regulations (BS 7671) and current building regulations. These products can safely be fitted into Zone 2.
  • Page 2 Packing information & installation Package content: Battery powered Mirror Screws Manual Attention: Installation and connection to electric wiring must be done by a professional electrician in compliance with local and national requirements for electrical installations. Never modify the construction or add any parts which are not offered as spare parts or accessories by the manufacturer of the luminaire.
  • Page 3 Hanging the mirror Installation Procedure To ensure the normal use of this product, it is required you set out wires as per the regulations of IEE at the installation places. This product should be installed on a wall suitable to hold its weight.
  • Page 4 Hanging the mirror Pull out the battery box on Hang the product on Finally simply press the the bottom of the mirror the wall hook. button to turn the and insert 8 AAA batteries. mirror, lights on and off. Push the battery box into position once the batteries are inserted.