KLINGER KHD-SGF Installation, Operation & Maintenance Manual

V-notch segment ball valve

Advertisement

Quick Links

V-Notch Segment Ball Valve
KHD-SGF
Installation, Operation,
& Maintenance Manual
IOM-KHD-SGF-111_V1.4_EN
Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the KHD-SGF and is the answer not in the manual?

Questions and answers

Summary of Contents for KLINGER KHD-SGF

  • Page 1 V-Notch Segment Ball Valve KHD-SGF Installation, Operation, & Maintenance Manual IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 2: Table Of Contents

    3.2 Cleaning 3.3 Manual Operation 3.4 Remote Operation 3.5 Techinical Data Maintenance 4.1 General Notes 4.2 Maintenance Frequency 4.3 Disassembly 4.4 Reassembly 4.5 Troubleshooting 4.6 Technical Data and Product Information IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 3: I Introduction

    However, the processes used are completely the utmost care must be taken. It is suggested non-toxic. IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 4: Storage

    User should avoid installing the valve so that the shaft point downwards because impurities travel- ing in the pipeline may enter the body cavity and damage the gland packing. IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 5: Installation Of Wafer Ends

    Ball, seat, and stem will be damaged. IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 6: Pneumatic And Electrical Connections

    Before installing the actuator, use an adjustable wrench to manually rotate the valve stem sever- IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 7: Operation

    Instructions for the relevant actuator. KLINGER Die Erste V-notch Segment Ball Valves have ¼ turn operation opening in a counter-clock- wise direction. When the handle is positioned across IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 8: Techinical Data

    DN200 8" 1473 1703 DN250 10" 1800 2081 DN300 12" 3256 3764 Temperature (°F) DN350 14" 5515 6375 DN400 16" 7292 8430 KHD-SGF-PN16 GRAPHITE PACKING PTFE PACKING Temperature (°C) IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 9: Maintenance

    Note: Please make sure that the Segment Ball (8) is not going to fall out of the valve and been damaged. IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 10: Reassembly

    5. For soft-seated model, put the SOFT SEAT RING (10A) with compressed SPRINGS (9A), O-RING (11) and SOFT SEAT (10B) into the valve cavity and push it toward the upstream end for posi- IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 11: Troubleshooting

    Seat damaged segment or seat Gland bolts are Tighten the gland Valve leaking from loosened bolts stem Parts are worn or Replace the neces- (External Leakage) damaged sary parts IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.
  • Page 12: Technical Data And Product Information

    B8M/B7 SS316 WASHER SS316/Carbon Steel SEGMENT BALL CF8M+Cr GLAND CF8M/WCB LOCK SPRING 17-7PH GLAND STUD B8M/B7 SPRING 17-7PH GLAND NUT 8M/2H METAL SEAT F316+STL BRACKET SOFT SEAT RING F304 IOM-KHD-SGF-111_V1.4_EN Copyright © 2022 by KLINGER DIE ERSTE INDUSTRY CO., LTD.