Page 2
Other hindering conditions will be detailed in the Body Builder’s Guide (www.fleet.ford.com/truckbbas/) The DBT-MDF20 kit includes two cables. The first cable (J1 Harness) connects to the module via connector J1 and has three labeled sets of 20-inch blunt cut wires: five wires for SEIC, five wires for inputs, and six wires for data bus signal outputs.
Page 3
Ford’s Body Builder Advisory Service. (www.fleet.ford.com/truckbbas/) We recommend installing the DBT-MDF20 system under the dash near the SDLC Gateway due to the proximity of the wiring connections and cable length. The unit should not be located in the engine compartment or any other location that is not protected.
Page 4
2.3 Mounting Mount the DBT-MDF20 module under the dash or on a flat surface using the two mounting holes. Ensure that you have sufficient distance to install the 36 inch SDLC Gateway Y cable that is part of the J2 harness.
Page 6
Note: As long as the unit has power (connected via the Red wire on the J2 harness) and the vehicle is on (data bus signals are not transmitted when the vehicle is off), the DBT-MDF20 will provide these output signals, regardless of the status of the throttle controls and engine RPM.
Page 10
- S BRAKE - V SPEED - ACCELERATOR 0.8” Group 1 0.4” Group 2 DBT-MD I/O Harness Group 3 DBT-MDF20 SDLC Throttle Harness Sensors and Power Color Signal Pin2 Black GND for Remote Accel Pedal Pin3 Orange T1 Pin7 +12V...
Need help?
Do you have a question about the DBT-MDF20 and is the answer not in the manual?
Questions and answers