4.11 Converting the BDFB System
The following diagram shows the connection for a top feed, 8 panel, 2-load BDFB system.
Link bars connect
the 4 panels, on
1 bank
54
Load shunt bus kit
Breaker/fuse loads
1 through 20
to the equipment
Figure 27 — 8-Panel, top fed BDFB
Load shunt bus kit
1
2
3
4
5
6
7
8
Breaker/fuse loads
1 through 20
to the equipment
Link bars connect
the 4 panels, on
1 bank
9400009-J0 Rev K
Need help?
Do you have a question about the Smart BDFB and is the answer not in the manual?