Download Print this page

GE Ajax DPC 2804 LE Operation & Maintenance Manual page 12

Advertisement

Table of Contents
Power Piston Striking Clearance (Non-LE)
Engine Piston Rod Stuffing Box
Packing ring installation
Figure 11-3: Packing ring installation
Compressor piston rod stuffing box
Packing ring installation
Figure 11-4: Packing ring installation
Ajax Power Cylinder Balancing
Ajax Low Emissions Retrofit Conversions
Ajax Low Emissions Retrofit Conversions, 13-1/4 inch and 15 inch Bores - Assembly Procedure
Figure 11-5: Clearance Between the Piston and Head
Gas Cam Timing
Figure 11-6: Control Box and Cams
Ignition Timing
Igniter Assembly Installation
Figure 11-7: Igniter Assembly
Accessories
Spark plugs
Air intake filter
Breather cap
Main Bearing & Crankshaft Installation
Main Bearing Installation
Figure 11-8: DPC-2804 Series Main Bearing Installation
Crankshaft Installation
Figure 11-9: DPC-2804 Series Crankshaft Installation and Orientation
Figure 11-10: Lowering the Crankshaft into the Frame
Main/Thrust Bearing Installation
Bearing Clearances
Figure 11-11: Plastigage® Measurement
Crankshaft Web Deflection
Figure 11-12: Compressor Pins, Center Main, for 3- and 4-Throw Crankshafts
®
AJAX
105
106
106
106
107
107
107
107
108
108
109
109
110
110
110
111
111
111
111
112
112
112
112
113
113
114
114
114
115
115
116
10

Advertisement

loading

This manual is also suitable for:

Ajax dpc 2804 non-le