Clearance Requirements; Device Installation - Huawei SUN2000-M5 Series Quick Manual

Table of Contents

Advertisement

The information in this document is subject to change due to version upgrade or other
reasons. Every effort has been made in the preparation of this document to ensure accuracy
of the contents, but all statements, information, and recommendations in this document do
not constitute a warranty of any kind, express or implied.
Only qualified and trained electrical technicians are allowed to operate the device. Operation
personnel should understand the system composition and working principles, as well as the
local regulations.
Before installing the device, read the user manual carefully to get familiar with product
information and safety precautions. Device damage caused by failure to abide by the
storage, transportation, installation, and operation guidelines specified in this document and
the user manual is not covered by the product warranty.
Before installing the device, check that the package contents are intact and complete against
the packing list. If any damage is found or any component is missing, contact your dealer.
Use insulated tools and wear proper personal protective equipment (PPE) when installing
the device.
1

Clearance Requirements

If the installation clearance does not meet the requirements, the inverter power may be derated.
2

Device Installation

If cables are not connected immediately after the device is installed, you need to install a junction
box. Otherwise, the airtightness and waterproof performance of the device may be affected.
Copyright © Huawei Digital Power Technologies Co., Ltd.
1
2023. All rights reserved.