Preface Thank you for purchasing and using CUAV products. If you have any suggestions and feedback on our products or services, please let us know. Press Ctrl and click blue text or mobile phone scan the QR code below to visit CUAV feedback form.
Power Requirement Mount the antenna to the P8 before connecting power. Both the sky terminal and the ground terminal need to use an independent power supply instead of obtaining power from the flight controller. Please ensure that the maximum output current of the power supply is >2.5A (3~6s battery is recommended).
Default Configuration The default configuration of P8 is: link rate (276000), interface baud rate 57600, broadcast mode. Generally speaking, P8 is plug and play, you don't need to perform any configuration, just plug and play. If you need to modify the...
Page 5
Ground Station Connection Mission Planner After connecting to the P8, select the correct port in the upper-right corner of the ground station, select 57600 baud rate, and click [CONNECT] to CONNECT to the ground station. Port not recognized? After the P8 is connected, the mouse moves randomly and...
Page 6
In the following interface, enter [name] [type] [serial port] and [baud rate], and click OK. Select the connection you just added and Click Connect. - 6 -...
Antenna: SMA inner needle Serial:GHR-06V-S USB: TYPE-C Power: XT30PW-M Operation -40°C~85°C Temperature Weight P8 module;:55g Antenna:31g Total: 86g Size 65mm×40mm×18mm Packing List The package list is for reference only. The details are displayed on your purchase page. Name Sky Unit...
Please make sure that the maximum current input at the power port is greater than 2A; Otherwise, the P8 may be stopped; It is recommended that the ground unit use independent power supply instead of flight control power supply (connect V5 + flight control can not use independent power supply).
Need help?
Do you have a question about the P8 and is the answer not in the manual?
Questions and answers