Franklin Fueling Systems UPP VTU-110V User Manual
Franklin Fueling Systems UPP VTU-110V User Manual

Franklin Fueling Systems UPP VTU-110V User Manual

System integrity testing kit

Advertisement

Quick Links

UPP
SYSTEM INTEGRITY TESTING KIT
®
MODEL VTU
USER GUIDE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UPP VTU-110V and is the answer not in the manual?

Questions and answers

Summary of Contents for Franklin Fueling Systems UPP VTU-110V

  • Page 1 SYSTEM INTEGRITY TESTING KIT ® MODEL VTU USER GUIDE...
  • Page 2 Copyright © 2022 Franklin Fueling Systems, LLC, Madison, WI 53718. All world rights reserved. No part of this publication may be stored in a retrieval system, transmitted, or reproduced in any way, including, but not limited to, photocopy, photograph, magnetic, or other record, without the prior written permission of Franklin Fueling Systems.
  • Page 3: Table Of Contents

    Contents Introduction ............................3 Safety Instructions .........................3 Liability Restrictions ........................3 Unit Care ............................4 Operating Instructions ........................4 Test 1 - Testing the Base of a Two-Piece Tank Chamber .............5 Test 2 - Testing the Base of a Two-Piece Tank Chamber (2) ............5 Possible Leak Points: ........................6 Test 3 - Testing the Chamber Riser ....................6 Vacuum Test Parameters .......................7...
  • Page 4 Intentionally Blank...
  • Page 5: Introduction

    Introduction This manual contains the procedure and other information for using the UPP® System Integrity Testing Kit, model VTU. The UPP® System integrity testing kit allows for precise testing of the tightness of single wall underground tank chambers (sumps) and dispenser sumps. The versatile unit can also be used to test double wall dispenser and tank chambers and also the interstitial space in secondary contained (double wall) pipe systems.
  • Page 6: Unit Care

    Unit Care • Ensure the push-fit blanking plug is fitted when the unit is not being operated. This is especially important while transporting the unit. • Ensure adequate training has been received from FFS before using the program “unregulated pressure output” to avoid damage to the gauge / sensor. •...
  • Page 7: Test 1 - Testing The Base Of A Two-Piece Tank Chamber

    Test 1 - Testing the Base of a Two-Piece Tank Chamber After installing the tank chamber base, test for tightness as follows: 1. Make sure vacuum lid gaskets and chamber base flange are clean and free of dirt or debris. 2.
  • Page 8: Possible Leak Points

    9. When vacuum has been held for the required test period, the green light will illuminate and the chamber can be considered leak-tight. 10. If the vacuum is not held, a red light will illuminate and the chamber should be investigated Possible Leak Points: •...
  • Page 9: Vacuum Test Parameters

    Vacuum Test Parameters Setting Vacuum Time Chamber / Sump -30 mbar 7 minutes Spill Bucket -30 mbar 1.5 minutes Fault Diagnosis Fault Solution Vacuum level not reached or keeps • Check and listen for leaks in all the areas outlined in on falling.
  • Page 10: Accessories

    No liability will be accepted by Franklin Fueling Systems or its distributors / agents for damage caused during tests carried out on other manufacturers equipment.
  • Page 11 85 Cavendish Street Ipswich Suffolk IP3 8AX Tel: 01473 214040 www.KaysElectronics.com THROUGH HOLE PCB ASSEMBLY WIRING & CABLE ASSEMBLY ELECTROMECHANICAL ASSEMBLY Microcustom International Ltd t/as Kays Electronics VAT Registration No: GB 775 7827 69 Registered Office: 37 Lower Brook Street, Ipswich, Suffolk IP4 1AQ Company No: 04227045 (England and Wales)
  • Page 12 408047001 r2...

This manual is also suitable for:

Upp vtu-230v

Table of Contents