Page 1
ASSEMBLY INSTRUCTION 1610FGY-1 FULL UPH BED 1610GY-1 QUEEN UPH BED H O M E L E A N CE PART LIST: A:Left Leg B:Right Leg C:Headboard D:Headboard Stretcher G: Side Rail E:Rail J:Rail H: Side Rail 2PCS 2PCS K:Center Rail- Front/Rear...
HARDWARE LIST: 1: Bolt 1/4*19mm 2: Bolt 5/16*40mm 3: Bolt 1/4*35mm 4: Bolt 1/4*40mm X 44pcs X 4pcs X 4pcs X 12pcs 6: Nut 1/4 7: Nut M8 8: Washer 1/4 5: Bolt 1/4*30mm X 2pcs X 20pcs X 2pcs X 10pcs 9: Washer 10: Allen Key...
Page 3
N ote: Please do not tighten all bolts until the bed is assembled completely. STEP 1 Hardware 2: 4 pcs Hardware 3: 4 pcs Hardware 8: 4 pcs Hardware 9: 4 pcs STEP 2 Hardware 1: 4 pcs STEP 3 Hardware 4: 10 pcs Page:3/7...
Page 4
N ote: Please do not tighten all bolts until the bed is assembled completely. STEP 4 Hardware 1: 20 pcs Hardware 8: 8 pcs STEP 5 Hardware 1: 4 pcs Hardware 5: 4 pcs Hardware 8: 8 pcs STEP 6 Page:4/7 Hardware 7: 2 pcs...
Page 5
N ote: Please do not tighten all bolts until the bed is assembled completely. STEP 7 Hardware 1: 8 pcs STEP 8 Hardware 1: 4 pcs STEP 9 Page:5/7 Hardware 1: 4 pcs...
Page 6
N ote: Please do not tighten all bolts until the bed is assembled completely. STEP 10 Hardware 4: 2 pcs Hardware 5: 2 pcs Hardware 6: 2 pcs STEP 11 STEP 12 Page:6/7 Hardware 5: 4 pcs...
Page 7
N ote: Please do not tighten all bolts until the bed is assembled completely. COMPLETED For items use on wooden floor, hard surfaces or carpets,it is recommended to Install protective pads under all legs and supports to avoid/prevent from damages/scratches and discoloration. Page:7/7...