Page 1
Strada Transfer & Rapide Evolution 2 With Strada Evolution 1 fastening kit and anchoring protection plate Installation manual Ref.: 504011588_1...
Page 2
Translated into English in May 2010 Copyright 2010 Parkeon. All rights reserved. Parkeon reserves all proprietary rights relating to the contents of this document. Parkeon reserves all rights over usage, reproduction, representation, marketing, translation, adaptation or modification, and generally all rights over present and future utilisation by any means, for any purpose and in any territory, throughout the period of protection.
Contents 1. Safety ..................4 2. About this document…..............7 3. Tools ..................8 4. Dimensions ..................8 5. Opening the door and trap door ............9 Configuration with mechanical lock ..........9 Unlocking the access door ............10 6. Anchoring in an excavation with a base box ........11 Recommendation..............
1 - Safety Safety Parkeon products are designed to limit the risk to users or operators from power sources, high temperature, fire, mechanical parts, radiation or chemicals. The product is compliant with the directive: Directive 2004/40/EC of the European Parliament and of the Council of 29 April 2004 on the minimum health and safety requirements regarding the exposure of workers to the risks arising from physical agents (electromagnetic fields).
Page 5
1 - Safety Directive 2004/108/EC of the European Parliament and of the Council of 15 December 2004 on the approximation of the laws of the Member States relating to electromagnetic compatibility and repealing Directive 89/336/EEC. United States of America This product is compliant with: The National Electrical Code The Americans with Disabilities Act (ADA) The Federal Communication Commission (FCC) rules part 15...
Page 6
These elements must be disposed of in accordance with local regulations. IMPORTANT: Parkeon shall not be liable for any modifications to the Pay & Display machine or failure to use it in accordance with the instructions in this manual. Environment The product is compliant with the directives: •...
2 - About this document… About this document… This document is to be used by personnel responsible for construction and masonry work. With a universal power supply, the installation requires the simultaneous presence of a qualified electrician for the connections and a maintenance agent for the general installation of the terminal.
3 - Tools Tools Use clean grease-free tools to install the terminal correctly. Appropriate tooling will be required for correctly installing the removal protection nut. The following are needed for preparing a terminal: • door opening tool (ref. 135964), • square key (ref. 135078), •...
5 - Opening the door and trap door Opening the door and trap door IMPORTANT: First make sure that the keys to the upper maintenance door are available. 5.1 Configuration with mechanical lock • Carry the terminal up to the site on its transport pallet. •...
5 - Opening the door and trap door 5.2 Unlocking the access door Access door lock Access door locking flap • Unlock the flap that holds the access door lock. • Lift the access door lock. IMPORTANT: After the parking terminal is installed, lower the access door lock to lock the door.
6 - Anchoring in an excavation with a base box Anchoring in an excavation with a base box 6.1 Recommendation For anchoring in an excavation, Parkeon recommends the following: • concrete base (B25), • minimum concrete thickness 500 mm. 6.2 Composition of fasteners...
6 - Anchoring in an excavation with a base box 6.3 Excavation installation with base box (1200 mm high) User button height 1200mm IMPORTANT: Installation in accordance with standards EN15291, DDA, IMPORTANT: Cash from a terminal that is installed so that the final height of user buttons is 1200 mm cannot be collected with a collection trolley.
Page 13
6 - Anchoring in an excavation with a base box IMPORTANT: If a form is being used for installation, install it in the base box. Base box Form • Dig a hole measuring 600 x 600 x 600 mm. Finished ground: Paving Concrete etc.
Page 14
6 - Anchoring in an excavation with a base box Fastening 6.3.2 • Fill the hole with concrete over a height of 500 mm. • Set in the base box, pushing the anchoring rods into the concrete (the top of the base box must be flush with the finished ground level).
Page 15
6 - Anchoring in an excavation with a base box • Place 4 washers and 4 M16 nuts on the anchoring rods. • Set the 4 lower M16 nuts in contact with the housing. • Check if the housing is vertical. •...
Page 16
6 - Anchoring in an excavation with a base box Installation in accordance with standards EN15291, DDA, ADA Strada Evolution 2 - Transfer and Rapide - Installation manual 16 / 42...
6 - Anchoring in an excavation with a base box 6.4 Excavation installation with variable height base box (1241 mm < user button height < 1337 mm). IMPORTANT: The form may be used but is not indispensable. Depending on the position of the base box in the hole, the final height of the housing may be adjusted by 96 mm.
Page 18
6 - Anchoring in an excavation with a base box • Dig a hole measuring 600 x 600 x 600 mm. Finished ground: Paving Concrete etc. Top of concrete Fastening 6.4.2 • Fill the hole with concrete over a height of 500 mm. •...
Page 19
6 - Anchoring in an excavation with a base box • Comply with the drying time recommended by the concrete supplier. • Carry out the finishing work up to the ground level. If the ground is to be finished in concrete or paving stones, you need not wait for the concrete to set.
Page 20
6 - Anchoring in an excavation with a base box Finished ground 1 Finished ground 2 Finished ground 3 Depending on the position of the base box in the ground (installation depth), the height of the user buttons may thus be 1241 mm (with finished ground 1), 1300 mm (with finished ground 2) or 1337 mm (with finished ground 3).
6 - Anchoring in an excavation with a base box 6.5 Excavation installation with base box on sloping ground IMPORTANT: Make sure that at least one of the holes for letting water out of the base box is not blocked. Draining holes front of the terminal Terminal...
7 - Anchoring on flat ground with base box Anchoring on flat ground with base box 7.1 Recommendation For anchoring on flat ground, Parkeon recommends the following: • concrete base (B25), • minimum concrete thickness 500 mm (minimum drilling depth 250 mm), •...
7 - Anchoring on flat ground with base box 7.3 Installation on flat ground with base box (1337 mm high) User button height 1337 mm Preparation 7.3.1 • Prepare the base box with 8 nuts and 4 anchoring rods, following the 104 mm height requirement (protective plate on the front of the terminal).
Page 24
7 - Anchoring on flat ground with base box • Drill 4 Ø20 holes in the ground, using the drawing below as the basis (192 x 160). 280 mm 192 mm Front of the terminal • Follow the order of drilling operations given below: •...
Page 25
7 - Anchoring on flat ground with base box Fastening 7.3.2 • Fasten 4 M16 nuts (or 4 couplings) on the threaded rods (12 mm above the base box) and level them. Anchoring protection plate Base box • Set the housing on the nuts. •...
Page 26
7 - Anchoring on flat ground with base box Strada Evolution 2 - Transfer and Rapide - Installation manual 26 / 42...
7 - Anchoring on flat ground with base box 7.4 Installation on flat ground with base box (1200 mm high) User button height 1200 mm IMPORTANT: Installation in accordance with standards EN15291, DDA, IMPORTANT: Cash from a terminal that is installed so that the final height of user buttons is 1200 mm cannot be collected with a collection trolley.
Page 28
7 - Anchoring on flat ground with base box IMPORTANT: For correct terminal installation, the ground must be perfectly horizontal. • Drill 4 Ø20 holes in the ground, following the diagram below (192 x 160): 280 mm 192 mm Front of the terminal Strada Evolution 2 - Transfer and Rapide - Installation manual 28 / 42...
Page 29
7 - Anchoring on flat ground with base box • Follow the order of drilling operations given below: • Put the base box in place and check that the bottom of the base box touches the ground. • Remove the base box and inject the chemical anchoring material into the four holes, then install the base box with the four threaded rods.
Page 30
7 - Anchoring on flat ground with base box Fastening 7.4.2 • Do the finishing work. • In order to stop water accumulating in the base box, fill the base box with concrete or sand. • Tighten 4 M16 nuts (or 4 couplings) on the threaded rods up to the base box level.
Page 31
7 - Anchoring on flat ground with base box Installation in accordance with standards EN15291, DDA, ADA Strada Evolution 2 - Transfer and Rapide - Installation manual 31 / 42...
Anchoring on flat ground without base box IMPORTANT: Installation in accordance with standards EN15291, DDA, 8.1 Recommendation For anchoring on flat ground, Parkeon recommends the following: • concrete base (B25), • minimum concrete thickness 500 mm (minimum drilling depth 250 mm), •...
8 - Anchoring on flat ground without base box 8.3 Anchoring on flat ground without base box 8.3.1 Preparation • Check the dimensional requirements of the terminal (refer to section Dimensions). IMPORTANT: For correct terminal installation, the ground must be perfectly horizontal.
Page 34
8 - Anchoring on flat ground without base box • Follow the order of drilling operations given below: • Check that the threaded rods are 60 mm above the ground. • Inject the chemical anchoring material into the 4 holes and install the 4 threaded rods.
Page 35
8 - Anchoring on flat ground without base box Fastening 8.3.2 • Tighten the 4 M16 nuts (up to the base box level) on the threaded rods. • Set the housing on the threaded rods. • Place 4 washers and 4 M16 nuts on the anchoring rods. •...
Page 36
8 - Anchoring on flat ground without base box This housing height complies with standards En15291, DDA, ADA. Strada Evolution 2 - Transfer and Rapide - Installation manual 36 / 42...
9 - Installing the upper part of the terminal Installing the upper part of the terminal There are different ways of fitting the upper part of the terminal, depending on the ordered options. 9.1 Parking terminal alone • Use a ratchet handle and a 13-mm socket. Filler screw Sealing Housing...
9 - Installing the upper part of the terminal 9.3 Terminal with zone indicator • Use a ratchet handle and a 13-mm socket. Filler screw Waterproofing washers Zone indicator Nut with base Housing 9.4 Terminal with integrated solar top and/or antenna cover and zone indicator •...
Page 39
9 - Installing the upper part of the terminal Solar cable Housing Solar and antenna cable gland seal 1 mm Fitting the solar cable and antenna gland seal Strada Evolution 2 - Transfer and Rapide - Installation manual 39 / 42...
10 - Applying the stickers 10. Applying the stickers 10.1 Sticker plate (CONF1 to CONF14) The drawing below shows the position of the different stickers on a terminal. If a contactless antenna is fitted: • Place a round black If a card reader is to be installed and yellow sticker on later on: the lower front.
10 - Applying the stickers 10.2 Zone marking The drawing below shows the position of the zone marking stickers on a terminal. The zone marking sticker is applied on the P sticker. Strada Evolution 2 - Transfer and Rapide - Installation manual 41 / 42...
11 - Installing the battery 11. Installing the battery • Insert the battery and connect it to the main board. • The battery terminals must be to the back of the housing and the cable is to be placed to the left of the battery so as to not obstruct the upper door. Solar IMPORTANT: Refer to the Strada maintenance manual for putting into service and...
Need help?
Do you have a question about the Strada Transfer and is the answer not in the manual?
Questions and answers