Page 5
[PRE-FEB 2022] Early release and pre-production models of the Maverick Lite Trike used a two-part connector system to attach the paramotor airframe to the trike chassis. The following fitment instructions are for those pilots that have been provided with this method of airframe attachment...
Page 6
The following fitment instructions are for those pilots that have been provided with this method of airframe attachment… To begin, place the Maverick behind the trike chassis, between the rear axles and with the harness arms orientated towards the front of the trike chassis.
Page 7
BUILD MY LITE TRIKE FINAL FIXTURES & FITTINGS To complete your Maverick Lite Trike setup, you only need to attach the paracord to the harness to aid weight shift, and assemble the outer ring guard. When fully assembled, we recommended you undertake a thorough check ensuring correct and secure assembly of components, and that there is no sign of wear or damage to your equipment.
WARNING: Before starting your engine, make sure you have carried out a thorough inspection of both the Lite Trike and Maverick WARNING: We recommend that you do not start paramotor using the check list at the back of this manual. We recommend that you do not start your Maverick paramotor while your Maverick paramotor while placed on the ground.
Need help?
Do you have a question about the MAVERICK and is the answer not in the manual?
Questions and answers