B.1. INSTRUMENT CHECK SHEET
B.1.1
. THIS INSTRUMENT CHECK SHEET IS TO BE FILLED COMPLETELY BY THE
TECHNICIAN OR OPERATOR INVOLVED WHEN FULLY TESTING THE
MULTIPYCNOMETER.
B.1.2.1. OPERATOR
B.1.2.2. DATE
B.1.2.3. MODEL
B.1.2.4. SERIAL NUMBER
B.1.3. ADD TICK MARKS TO CONFIRM THAT THE STEPS
OUTLINED IN THE SECTIONS INDICATED BELOW HAVE
BEEN CARRIED OUT SATISFACTORILY.
B.1.3.1.
ELECTRICAL CHECKS (SECTION 5.1.1.)
B.1.3.2.
MECHANICAL CHECKS (SECTION 5.1.2.)
B.1.3.3.
AC CHECKS (SECTION 5.2.1.)
B.1.3.4.
DC CHECKS (SECTION 5.2.2.)
B.1.3.5.
DIGITAL PANEL METER (SECTION 5.3.1.) 0.0000 PSIG
B.1.3.6.
PRESSURE RELIEF VALVE (SECTION 5.3.2.) 25 PSIG
B.1.3.7.
LEAK TEST PURGE ( SECTION 5.4.1.) 30 MINUTE
LEAK TEST
5.4.2.
MICRO
STARTING
PRESSURE
PRESSURE
AFTER 1
MINUTE
TOTAL a
=
TOTAL a = STARTING PRESSURE - PRESSURE AFTER 1 MINUTE.
B.1.3.8.
TOTAL PSIG DIFFERENTIAL LEAK RATE SHOULD BE NO
GREATER THEN 0.004 PSIG FOR EACH OF THE MICRO,
SMALL, LARGE, CELL AND FOUR WAY SECTIONS.
APPENDIX B
5.4.3.
5.4.4.
SMALL
LARGE
28
24.00+/-0.01 VDC
5.00+/-0.01 VDC
5.4.5
5.4.6.
CELL
FOUR WAY

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MULTIPYCNOMETER and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF