The Boiler Control 275 is designed to stage up to four condensing or non-condensing, modulating or on-off boilers using
P.I.D. staging to accurately maintain temperature. The control supports hybrid boiler plants that contain both condensing
and non-condensing boiler groups. Water temperature is controlled by outdoor reset for space heating applications or a
fixed setpoint for Domestic Hot Water (DHW) tank heating or industrial process heating applications. The control will also
accept an analog signal from an Energy Management System (EMS) to control the water temperature. Boiler equal run-time
rotation, pump exercising and stand-by system pump operation increase boiler plant reliability. The control is tekmarNet
communication compatible allowing for internet connectivity using an optional Gateway 483.
Additional functions include:
•
tN4 Compatible
•
BTC I Compatible
•
24 Hour, 5-11, 5-2, 7 Day Schedule
•
Flow or Combustion Air Proof
•
Four Modulating or On/Off Boilers
Boiler Control 275
One tN4, Four Modulating Boiler & DHW / Setpoint
tN4
tN4
Boiler
Bus
Input
Outdoor Sensor
Included
OR
0-10 or 2-10 V (dc)
from EMS
Input
Input
Universal
Universal
Sensor
Sensor
Included
Included
Installation & Operation Manual
Menu
Item
Do not apply power
1
2
3
4
5
6
7
8
9
10
11
Com
Out
Boil
Com
BRet/
Mod1
Mod2
Mod3
+
+
+
+
–
–
–
Sup
DHW
Output
Output
Up to 4
Up to 4
Modulating
Boiler Pumps
OR Boiler Enable
Boilers
Boiler Demand
DHW / Setpoint Demand
Proof Demand
Zone Load Shedding
Priority Override
EMS Input Signal
12
13
14
15
16
17
18
19
20
Relay
Relay
Relay
Relay
Mod4
+
1
2
3
4
OR
OR
Output
Combustion
Air Damper
OR Alert
1 of 48
Multi-Staging
•
Equal Run Time Rotation
•
Primary Pump Sequencing
•
DHW Operation
•
Optional DHW Sensor
•
Setpoint Operation
EMS
Setback
BTC I
Pump Sequencer
Fixed Last
Off
Rotate
Fixed Lead
First On / Last Off
First On / First Off
Off
Exercise
Demands
Test
off
red
red
For maximum heat,
press and hold Test
button for 3 seconds.
Designed and assembled in Canada by
tekmar Control Systems Ltd
tektra 1020-01
Power
115 V ±10% 60 Hz 7 VA, 1150 VA max.
Relays
230 V (ac) 5 A 1/3 hp
Demands
20 to 260 V (ac) 2 VA
Signal wiring must be rated at least 300 V.
21
22
23
24
25
26
27
28
29
30
C.A. /
DHW
Prim
Power
Boiler
DHW
Com
Alert
/ P2
P1
L
N
Demand
/Setp
Dem
Output
Output
DHW Pump
Primary
OR
Pump
Power Supply
Primary Pump
© 2012
D 275
01/12
Replaces:03/09
®
not testing
testing
testing paused
Meets Class B:
Canadian ICES
FCC Part 15
31
Pr.
Dem
Input
Flow OR
C.A. Proof
Input
DHW OR
Setpoint
Demand
Signal
Input
Boiler
Demand
Signal
Input
115 V (ac)
D 275 - 01/12
Need help?
Do you have a question about the Boiler Control 275 and is the answer not in the manual?
Questions and answers