Think Fencing Zappa Rail Installation Manual

Rural fencing

Advertisement

Quick Links

Rural Fencing
Zappa Rail.
Installation Guide
Zappa Rail | Installation Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Zappa Rail and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Think Fencing Zappa Rail

  • Page 1 Rural Fencing Zappa Rail. Installation Guide Zappa Rail | Installation Guide...
  • Page 2 Timberline x4 Rail – Red Gum Zappa Rail | Installation Guide...
  • Page 3: Table Of Contents

    Contents Getting Started Installation Tips Electrifying Tools Required Instructions Option One - Using Line Strainer Option Two - Using Insulstrainer Joining Zappa Rail using a Line Strainer Joining Zappa Rail using a Joining Buckle Zappa Rail | Installation Guide...
  • Page 4: Getting Started

    Warranty Resistant Installation Tips If you need to join the Zappa Rail you can achieve this by We recommend a 4m post spacing. Zappa rail can purchasing a Zappa Rail Joining Buckle or a Line Strainer accommodate up to a 6m spacing.
  • Page 5: Tools Required

    What you will need to get the job done. Tape Measure Pencil Wire Cutters Drill with 8mm Scissors or Shifter or Tek Head Shape Knife 20mm Spanner Safety Glasses Screwdriver Set Square Ratchet Angle Grinder/ Drop Saw Zappa Rail | Installation Guide...
  • Page 6: Instructions

    Refer to installation tips on end assembly construction Top Bracket Side Bracket Screw the top of each bracket onto the posts along the fence run using a Tek screw. Do not screw the bottom of the bracket. What you will need: Zappa Rail | Installation Guide...
  • Page 7 Please note: Ensure that you have the conductive wire orientated correctly to suit your specific needs when electrified. Roll the Zappa Rail out along the fence run. Lift the Zappa Rail up into the bracket and clip the bottom of bracket to hold in place.
  • Page 8 Fasten the bottom screws into the top and What you will need: side brackets. Pull the Zappa Rail tight by hand and mark where you need to cut the rail. Make sure you leave an extra 1000mm to thread through the End Bracket. Use a set square to mark a square out.
  • Page 9 Attach the Zappa Rail to the second end bracket keeping it as tight as possible. Slide the Zappa Rail through cut out one then back through cut out two. Make sure that at least 1000mm of Zappa Rail is pulled through the End Bracket.
  • Page 10 Tension the Zappa Rail using two ratchets (one on the top and one on the bottom). Once tensioned hold in place using the rods What you will need: provided. Zappa Rail | Installation Guide...
  • Page 11 Zappa Rail | Installation Guide...
  • Page 12: Option Two - Using Insulstrainer

    Attach the Insulstrainer at the same height as the End Bracket. Put nut and bolt (not supplied) through the middle of the Insulstrainer and fasten using four Tek What you will need: screws on each corner of the Insulstrainer. Zappa Rail | Installation Guide...
  • Page 13 Please note: Ensure that you have the conductive wire orientated correctly to suit your specific needs when electrified. Roll the Zappa Rail out along the fence run. Lift the Zappa Rail up into the bracket and clip the bottom of bracket to hold in place.
  • Page 14 Cut out one Cut out two Attach the Zappa Rail to the end bracket. Slide the Zappa Rail through cut out one then back through cut out two. Make sure that at least 100mm of Zappa Rail is pulled through the End Bracket.
  • Page 15 Pull the Zappa Rail tight by hand and mark where you need to cut the rail. Make sure you leave an extra 1000mm to thread through the End Bracket. Use a set square to mark a square out. Cut both wires using...
  • Page 16: Joining Zappa Rail Using A Line Strainer

    Joining Zappa Rail using a Line Strainer To join Zappa Rail using the line starainer, remove the rods then thread the two ends through the line stainer ensuring that it is overlapping at least 100mm. Tension the Zappa Rail using two rachets (one on the top and one on the bottom), then insert rods to hold in place.
  • Page 17: Joining Zappa Rail Using A Joining Buckle

    Joining Zappa Rail using a Joining Buckle Slide the Zappa Rail in through the middle cut out and back though the smaller cut out on the same side. Repeat for the other side. Zappa Rail | Installation Guide...
  • Page 18 Head Office: 2415 Geelong/Portarlington Road, Portarlington, 3223 Victoria Australia P. +613 5259 2555 E. sales@thinkfencing.com.au www.thinkfencing.com.au Zappa Rail | Installation Guide...

Table of Contents