MEYERTECH DIVISION ISSUE 01 CONTENTS PRODUCT WELCOME PRODUCT SUPPORT FEATURES INSTALLATION CONNECTING THE TELEMETRY DISTRIBUTION CONFIGURATION OPERATION PRESETS TOURS SPECIAL FUNCTIONS 6.3.1 FLIP 6.3.2 STORE TO EEPROM GLOBAL COMMANDS OPERATIONAL NOTES SPECIFICATIONS TROUBLE SHOOTING GUIDE DECLARATION OF CONFORMITY 10. PRODUCT WARRANTY 11.
Party Domes, the ZVM-328 provides a complete and powerful retail solution. This Manual should be used in conjunction with the standard ZoneVu Matrix and Keyboard manuals. MEYERTECH are dedicated to customer service and support. If you have any questions or problems, our staff will be pleased to assist you on the technical help line listed on page 16.
ISSUE 01 INSTALLATION To obtain the optimum performance from your ZoneVu system, please take time to read this manual before commencing installation. If you have any questions or problems our staff will be pleased to assist you on the technical help line listed on page 16.
MEYERTECH DIVISION ISSUE 01 OPERATION All Functions operate as described in the DVK-001 Manual with the following exceptions and additions: 6.1 PRESETS The system is limited to 64 presets on each Dome. Presets 1 – 63 are accesed through the Preset key, and preset 0 through the Home key.
ISSUE 01 MEYERTECH DIVISION F2 + 1 + Enter 6.4 GLOBAL COMMANDS The Domes do not support global commands. 6.5 OPERATIONAL NOTES The RS-485 interface to the domes relies on a 2-way communication protocol. If for any reason the dome fails to respond to repeated commands, it will be logged off the system. This will mean that any commands for that camera will be ignored, to prevent slowing down the rest of the system.
ISSUE 01 MEYERTECH DIVISION TROUBLE SHOOTING GUIDE This Trouble Shooting Guide should be used in the first instance of encountering any problems with your Dome control system. If problems persist, contact MEYERTECH on the Technical Help line numbers given on page 16. Symptom Solution Dome moves without...
MEYERTECH DIVISION ISSUE 01 DECLARATION OF CONFORMITY EC DECLARATION OF CONFORMITY ACCORDING TO ARTICLE 10 OF COUNCIL DIRECTIVE 89/336/EEC MEYERTECH Manufacture’s Name: Manufacture’s Address: MEYERTECH Division Office Block One Southlink Business Park Oldham OL4 1DE declares, that the product(s): Product Name : ZVD-GW1-STR Dome control interface Model(s) :...
ISSUE 01 MEYERTECH DIVISION PRODUCT WARRANTY MEYERTECH DIVISION warrants that at the time of shipment the products manufactured by Meyertech will be free from defects in material and workmanship. Should any defects appear within twelve months from date of shipment, Meyertech Division shall at it’s sole discretion repair or replace the defective material.
MEYERTECH DIVISION ISSUE 01 DOCUMENT HISTORY ZoneVu Interface Installation Manual: MAN-GW1-STR ISSUE DATE CHANGE RECORD 24 November 98 First Issue http://www.meyertech.demon.co.uk MAN-GW1-STR Page 12...
Need help?
Do you have a question about the ZoneVu ZVD-GW1-STR and is the answer not in the manual?
Questions and answers