Pentair GOYEN MECAIR PEM Manual page 5

Particulate emission monitor
Table of Contents

Advertisement

LIST OF FIGURES
Figure 1: Fitting the sensor to the stack ..................................................................................................................................... 11
Figure 2: Sensor PCB connections ............................................................................................................................................. 12
Figure 3: Power supply label (mains power) .............................................................................................................................. 13
Figure 4: Sensor wiring label (inside enclosure lid) .................................................................................................................. 14
Figure 5: Internal sensor controls .............................................................................................................................................. 15
Figure 6: Scaling method - Scaling Factor ................................................................................................................................ 17
Figure 7: Menu map - Engineering menu .................................................................................................................................. 20
© Copyright by Pentair International Ltd. 2019
This manual is provided as an aid to owners of a Pentair Environmental Systems instrument and contains information proprietary to Pentair Environmental Systems.
This manual may not, in whole or part, be copied, or reproduced without the express written consent of Pentair Environmental Systems.
Goyen Controls Co Pty Ltd reserve the right to change product designs and specifications without notice.
Issue 01 - May 2019
INSTALLATION AND OPERATION MANUAL - OWNER'S RECORD PEM MANUAL - PARTICULATE EMISSION MONITOR
v

Advertisement

Table of Contents
loading

Table of Contents