II-PLACEMENT AND INSTALLATION
Make sure unit is installed in accordance with installation
instructions and applicable codes.
III-START-UP
A-Preliminary and Seasonal Checks
1 - Inspect electrical wiring, both field and factory
installed for loose connections. Tighten as required.
2 - Check voltage at disconnect switch. Voltage must
be within range listed on the nameplate. If not,
consult the power company and have voltage
condition corrected before starting unit.
B-Heating Start-Up
WARNING
Shock and burn hazard.
SL280DFNV units are equipped with a hot surface
ignition system. Do not attempt to light manually.
1 - STOP! Read the safety information at the beginning
of this section.
2 - Set the thermostat to the lowest setting.
3 - Turn off all electrical power to the unit.
4 - This furnace is equipped with an ignition device
which automatically lights the burners. Do not try to
light the burners by hand.
5 - Remove the access panel.
6 - Turn switch on gas valve to OFF. Do not force. See
FIGURE 17.
7 - Wait five minutes to clear out any gas. If you then
smell gas, STOP! Immediately call your gas supplier
from a neighbor's phone. Follow the gas supplier's
instructions. If you do not smell gas go to next step
MANIFOLD PRESSURE ADJUSTMENT
(TURN CCW TO INCREASE PRESSURE)
NEGATIVE AIR
PRESSURE PORT
INLET
SUPPLY
PRESSURE
TAP
GAS VALVE SHOWN IN THE ON POSITION
FIGURE 17
8 - Move switch on gas valve to ON. Do not force. See
FIGURE 17.
9 - Replace the access panel.
10 - Turn on all electrical power to to the unit.
11 - Set the thermostat to desired setting.
GAS VALVE
POSITIVE AIR
PRESSURE PORT
OUTLET
MANIFOLD
PRESSURE TAP
NOTE - When unit is initially started, steps 1 through 11
may need to be repeated to purge air from gas line.
Turning Off Gas To Unit
1 - Set thermostat to lowest setting.
2 - Turn off all electrical power to unit if service is to be
performed.
3 - Remove access panel.
4 - Move switch on valve to OFF. Do not force.
5 - Replace access panel.
Failure To Operate
If the unit fails to operate, check the following:
1 - Is the thermostat calling for heat?
2 - Are access panels securely in place?
3 - Is the main disconnect switch closed?
4 - Is there a blown fuse or tripped circuit breaker?
5 - Is the filter dirty or plugged? Dirty or plugged filters
will cause the limit control to shut the unit off.
6 - Is gas turned on at the meter?
7 - Is the manual main shut-off valve open?
8 - Is the internal manual shut-off valve open?
9 - Is the unit ignition system in lock out? If the unit locks
out again, call the service technician to inspect the
unit for blockages.
10 - Is pressure switch closed? Obstructed flue will
cause unit to shut off at pressure switch. Check flue
and outlet for blockages.
11 - Are flame rollout switches tripped? If flame rollout
switches are tripped, call the service technician for
inspection.
C-Safety or Emergency Shutdown
Turn off unit power. Close manual and main gas valves.
D-Extended Period Shutdown
Turn off thermostat or set to "UNOCCUPIED" mode. Close
all gas valves (both internal and external to unit) to guar-
antee no gas leak into combustion chamber. Turn off pow-
er to unit. All access panels and covers must be in place
and secured.
IV-Heating System Service Checks
A-CSA Certification
All units are CSA design certified without modifications.
Refer to the SL280DFDV Installation Instruction.
B-Gas Piping
If a flexible gas connector is required or allowed by the
authority that has jurisdiction, black iron pipe shall be
installed at the gas valve and extend outside the furnace
cabinet.
Do not over torque (800 in-lbs) or under torque (350 in-
lbs) when attaching the gas piping to the gas valve.
Page 28
CAUTION
WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl280df060nv36bSl280df080nv60c

Table of Contents