Download Print this page

Pentair Raychem ECW-GF-DP Installation And Operating Instructions page 3

Advertisement

3
• Prepare communication cable by
stripping 1/4 in of insulation from
each wire.
• Install wires according to Steps 4
and 5.
.25 in
5
• Connect the
communication cable
to the ECW-GF-DP.
7
• Install plastic cover over
ECW-GF-DP Remote
Display Panel.
THERMAL BUILDING SOLUTIONS
1 Red
2 Black
3 White
4 Green
5 Orange
6 Blue
7 Brown
8 Yellow
EN-RaychemECWGFDP-IM-H58410      03/15
4
• Connect the communication cable to
the ECW-GF controller.
• Terminate cable shield in the SH
position on the J5 (Thermistor)
terminal block.
Remote Display Panel
J6
J5
Shield
T2
T1
6
• Stow wires and install ECW-GF-DP in
duplex junction box.
• Secure with screws supplied.
8
• Multiple heating cable circuits
may be monitored by mounting the
ECW-GF-DP in multiplex boxes.
ECW-GF
- D P
G F
W -
E C
r
r r o
n e
t io
ic a
u n
m m
r
w e
C o
P o
g =
t
n k in
e s e
B li
l t R
a u
d - F
t r ip
a u lt
u n
u r e
d - f
G r o
f a il
u n
G r o
r y
u it
g =
c ir c
n k in
o r
B li
e s t
l t T
a u
a s s
d - F
s t p
u n
lt t e
b e r
G r o
- f a u
a m
u n d
G F
a n d
W -
G r o
r e d
E C
g =
e ly
c k
n k in
n a t
c h e
lt e r
B li
m ;
g a
la r
k in
r a
B li n
t h e
= O
3 / 4

Advertisement

loading