Download Print this page

Toro Pro Control 138-7588 Installation Instructions page 2

Advertisement

Installing the Kit
1.
Remove the 3 shoulder screws from each pod
and remove the pods from both sides of the
machine
(Figure
Remove the fuel-tank cap before removing the
left pod
(Figure
2).
1. Shoulder screw
2. Pod
2.
Remove the 2 fuel-tank clips from the underside
of the fuel tank and rotate the fuel tank to the
side
(Figure
3).
1. Fuel tank
2).
Figure 2
3. Fuel-tank cap
Figure 3
2. Fuel-tank clips
3.
Remove the shoulder screw and washer
securing the top of the damper
4.
While holding the damper stud in place using a
wrench, remove the locknut (1/4 inch) securing
the bottom of the damper
1. Shoulder screw
2. Washer
3. Damper
5.
Secure the top of the new damper using the
g253592
previously removed shoulder screw and washer
(Figure
4).
Start by hand-tightening the shoulder bolt, then
torque it to 565 to 1130 N∙cm (50 to 100 in-lb).
6.
Secure the bottom of the new damper using the
previously removed locknut (1/4 inch) as shown
in
Figure
7.
Rotate the fuel tank back into position and
secure it using the previously removed fuel-tank
clips
(Figure
g253594
2
(Figure
(Figure
Figure 4
4. Stud
5. Locknut (1/4 inch)
4.
3).
4).
4).
g254332

Advertisement

loading