SolarEdge SE K-AU I Series Quick Installation Manual page 2

Three phase inverter with setapp configuration
Table of Contents

Advertisement

Legend
NOTE
This symbol denotes information intended to
assist the user in making optimum use of the
product.
CAUTION!
Denotes a hazard. It calls attention to a
procedure that, if not correctly performed or
adhered to, could result in damage or
destruction of the product. Do not proceed
beyond a caution sign until the indicated
conditions are fully understood and met.
!
WARNING!
Denotes a hazard. It calls attention to a
procedure that, if not correctly performed or
adhered to, could result in injury or loss of life.
Do not proceed beyond a warning note until
the indicated conditions are fully understood
and met.
Torque value
Do not cut cable connectors
Inverter ON/OFF Switch: 0=OFF;
1=ON; P=Pairing/Program
Turn ON/OFF the main circuit
board AC switch, and wait 5 minutes
Safety Switch (on optional DC
Safety Unit)
LEDs
1. Turn ON/OFF/P Switch to OFF (0)
2. Turn Safety Switch to OFF
3. Open cover screws
P 1 0
This symbol appears at grounding points on the
SolarEdge manuals and equipment.
10.3 N*m / 7.6 ft.*lb (Plastic)
Fasten screws in described order
9.0 N*m / 6.6 ft.*lb
3
1
5
1
4
MAN-01-00695-1.1
6
2
4
3
2
1
1

Advertisement

Table of Contents
loading

Table of Contents