TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL SUNSYSTEM Solar Collectors EVACUATED-TUBE COLLECTOR - VTC Series Support system for Flat roof, Inclined roof and Façade Model: ............. v. 0.1.1 Serial Number: ..........
INSTALLATION and OPERATION MANUAL Table of contents Explanation of symbols and safety instructions 1.1. Explanation of symbols 1.2. Requirements to collector installation place 1.2.1. Instructions to collector installer 1.2.2. Instructions to installation user Description of evacuated-tube collector VTC Packing and Transport Delivery Installation of VTC collector and the support system 5.1 Installation of collector VTC.
• Regulations and norms concerning safety installation and operation of solar collectors - protective gloves, eyewear should be used; make sure collector is securely attached to the building. Use only original SUNSYSTEM parts. DANGER of structure damage / injury from fall. The weight of collector/collectors must comply with the building structure, namely the distribution of weight;...
INSTALLATION and OPERATION MANUAL Risk of injury, burn upon installation and maintenance of solar collectors: - On contact with broken glass/vacuum tube - On contact with collector in function because of its high temperature. We recommend the use of protective equipment, gloves, eyewear (goggles), and clothing. Installation and maintenance of collectors must be carried out in the early morning hours.
INSTALLATION and OPERATION MANUAL Description of Evacuated-tube collector - VTC 2.1. Evacuated tube. Absorber coating. Diagram 1 Evacuated tubes are two concentrically positioned borosilicate glass tubes enclosing a gap of evacuated air. The internal glass tube is coated on its external surface with an environmentally friendly, highly selective layer and thus functioning as an efficient absorber.
INSTALLATION and OPERATION MANUAL 4. Packing and Transport During transport and installation, depending on the weight, suitable safety devices should be used in accordance with Directive 2006/42/EC. When transporting items weighing more than 30 kg, the use of pallet jack, fork truck or other hoisting devices is a must. We recommend transportation of collector to installation site in its packaging.
INSTALLATION and OPERATION MANUAL 5. Installation Must be performed by an authorized service technician/service shop for such operations. DANGER of slipping. In most cases, collectors are installed in hardly accessible and dangerous places. We recommend that installation and service maintenance be carried out by an authorized service technician observing all safety measures.
INSTALLATION and OPERATION MANUAL Evacuated tube collectors are mounted placing the manifold on the top and the rubber protectors in the bottom part. Such collectors have vertical orientation. Diagram 6 Collectors VTC type are mounted on specially designed support systems, adapted to different roof slopes. and facade.
INSTALLATION and OPERATION MANUAL 5.2. Inclined roof VTC type collector installation Installation is carried out by at least two people. We recommend consulting with a roofing expert. Diagram 9 Step 1. Install the four fixing straps B to the roof using the screws G. Diagram 10 Step 2.
Page 10
INSTALLATION and OPERATION MANUAL Step 3. At the bottom of both side rails F insert bottom rail H and in the top part - the VTC collector manifold A. Both collector manifold A and bottom rail H must lay perpendicular to the side rails F.
INSTALLATION and OPERATION MANUAL Step 5. Carefully take evacuated tube M out of the box. The upper end of the tube with a silver probe- like tip must fit inside its designated nest on manifold, spread beforehand with the heat-conductive paste (Е) included in consignment kit.
INSTALLATION and OPERATION MANUAL 5.4. Collector array connection - For connecting several collectors in array, it is necessary to use the flexible pipes between two collectors because of material expansion upon heating and contraction upon cooling. Diagram 15 Number of collectors VTC-type in one array: Model Number of Collectors VTC 15...
INSTALLATION and OPERATION MANUAL 6. Connecting the collector to Domestic Hot Water/Central Heating system 6.1. Connecting the collector to Domestic Hot Water/Central Heating system Must be performed by an authorized service technician/service shop for such operations. Our warranty does not cover damage from extremely strong force majeure acts of nature.
INSTALLATION and OPERATION MANUAL 6.2. Collector outlets/connections Upon design of vertical risers it is recommended that the heat carrier flow speed be between 0.5 and 0,8 m/s, and the riser pipes be made of copper. For example: For collector area 20m the required flow rate is 1000L/h at a heat-carrier speed of 0,5 m/s - recommended pipe section is ø28x1 Cu.
INSTALLATION and OPERATION MANUAL 6.4. Installation of Temperature sensor The solar collector temperature sensor should be coated with a thick layer of thermal paste and inserted into the sensor sleeve to the full depth. If the fit is too loose, slide a piece of copper plate or wire in beside the sensor, Seal the sensor sleeve opening with silicone sealant to prevent water ingress.
INSTALLATION and OPERATION MANUAL 6.8. Connection diagrams Must be performed by an authorized service technician/service shop for such operations. Diagram 17. . Connection of Evacuated-tube collector VTC to solid fuel boiler WBS, combi tank KSC2 and three-way valve 16-EN...
Page 17
INSTALLATION and OPERATION MANUAL Diagram 18. Connection of Evacuated-tube collector VTC to solid fuel boiler WBS, solar water tank SON, buffer tank P and three-way valve 17-EN...
INSTALLATION and OPERATION MANUAL 7. Commissioning Must be performed by an authorized service technician/service shop for such operations. Before commissioning of solar collector into operation, check: The air-tightness of all connections System air purging ...
INSTALLATION and OPERATION MANUAL Warranty terms. Failure to observe the installation and operating requirements described in this manual voids the warranty. 1. Manufacturing defects and materials guarantee Manufacturer expressly guarantees that the products it manufactures shall be free from defects in materials and workmanship which can prevent from normal operation under proper and normal use, installation and maintenance for the intended functions of the products for a period set out in the warranty certificate of the respective model of the collector you have bought.
Page 20
INSTALLATION and OPERATION MANUAL to the claim, said request shall be accompanied by a Purchase requisition from the Commercial Department. After decision for satisfaction of the claim has been made, the Purchase requisition mentioned above will be annulled by issuing a receipt for returned goods; with this receipt the customer can purchase another product with the same price in case the claim has proved grounded.
INSTALLATION and OPERATION MANUAL 11. RECYCLING AND WASTE DISPOSAL 11.1. Recycling of collector packaging Parts of the packaging made of wood or paper can be used as combustible for the boiler. Submit the rest of the packaging material for recycling according to the local regulations and requirements. Replaced heating installation components must be submitted for processing to an authorized factory which complies with the environmental protection regulation.