Measurement Set-Up - LANGER EMV-Technik P1401 User Manual

Table of Contents

Advertisement

LANGER
DE-01728 Bannewitz
mail@langer-emv.de
EMV-Technik
www.langer-emv.com
3.4

Measurement set-up

shows the basic set-up for immunity measurements with the P1401/P1501 IC test system
Figure 1
and the ICE1 test environment.
The test board together with the test IC is initially inserted into the GND 25 ground plane and
connected to the CB 0708 connection board. The IC is supplied with the required input signals via
the connection board. At the same time, the test IC's output signals can be monitored during the
measurement. Please refer to the user manual of the ICE1 test environment on how to use the
connection board.
Use the spacer ring to position and align the respective field source above the test IC when
measuring the IC's immunity to disturbances. The field source is then connected to the power
amplifier and the signal generator. Additionally, a directional coupler and a power meter can be
used to measure the forward and reverse power on the line between the power amplifier and the
field source.
The signal generator generates the required test signal. This signal is amplified by the connected
power amplifier and transmitted to the field source. The field source converts the input signal into
the respective field quantity, in other words into an electric or magnetic field.
P1401/P1501 and P1402/P1502 set
- 16 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

P1501P1402P1502

Table of Contents