Module Installation

Modules must be mounted on a DIN rail. The PROFINET Scanner module with power supply
attached fits into a 70mm deep enclosure.
Rated thermal specifications are based on a minimum clearance of 5.1cm (2in) above and
below the equipment and 2.54cm (1in) to the left of the PNS module.
In addition to clearances required for cooling, space must be allowed for the following
requirements:
1
Allow sufficient finger clearance for opening the PNS door.
Allow adequate clearance for communications port cables. For an example, see
2
page 2-3.
3
Allow adequate clearance for power wiring.
2-2
Minimum Clearances
Required for Cooling
25.4 mm
1.00 inch)
1
VersaMax PROFINET Scanner Manual – December 2013
134mm (5.28 inches)
2
3
GFK-2721A