Meech CyClean Series Operating Manual

Non-contact web cleaning

Advertisement

Quick Links

Operating Manual
CyClean-R™
Non-Contact Web Cleaning
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CyClean Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Meech CyClean Series

  • Page 1 Operating Manual CyClean-R™ Non-Contact Web Cleaning...
  • Page 2 Products shown in this document may be covered by one or more patents, patents applied for and/or registered designs and/or trade marks. For further information please refer to our Head Office or visit www.meech.com. © Meech Static Eliminators Ltd., 06.07.2020...
  • Page 3: Table Of Contents

    CONTENTS SAFETY INSTRUCTIONS General Safety Electrical Safety Warning and Information Labels WHAT IS INCLUDED UNPACKING THE CYCLEAN-R Removing Air Handling Unit Removing CyClean-R CYCLEAN-R SYSTEM OVERVIEW Function HOW CYCLEAN-R WORKS INSTALLATION PROCEDURE CyClean-R Configurations Suggested Order ot Installation Mounting the CyClean-R Pneumatic Connection Positioning of 924IPS Bars Connecting to Power Supply...
  • Page 4: Safety Instructions

    • Inspect the working environment and ensure it is clean and clear of hazards before removing equipment from packaging and positioning the system. • Visually check all equipment for damage. If damaged, contact your local Meech representative before continuing. • Observe warning symbols placed on the equipment, see page 5.
  • Page 5: Warning And Information Labels

    Warning and Information Labels Product Code Manual Opening Danger Mains Voltage sign indicates an immediate hazard. If not avoided, this will result in death or serious injury. This label is located on the top door on the Air Handling Unit. Caution - Hot sign indicates a potential hazard if not avoided, this will result in minor or moderate injury.
  • Page 6: What Is Included

    What is Included: Image Description CyClean-R Manifold 924IPS Pulsed DC Bar (x2 per Manifold)* *924IPS Cables not included. These can be purchased separately. Air Handling Unit (AHU) Operating Manual...
  • Page 7: Unpacking The Cyclean-R

    On receipt of the system, check the packaging for signs of shipping damage. If found, any damage should immediately be reported to the shipping company, the supplier of the system and Meech directly. Inside the packing crate check the system for signs of damage. If found, any damage should immediately be reported to the supplier of the system and Meech directly.
  • Page 8: Removing Cyclean-R

    3. Remove side panel by removing a further x6 metal clips. This will allow access to remove the Air Handling Unit safely from the packing crate. The Air Handling Unit will have banding straps to secure it to the pallet base which need to be removed and also a protective layer of ‘black wrap’, which needs to be carefully removed also.
  • Page 9: Cyclean-R System Overview

    CyClean-R is available as both a single-sided and double-sided cleaning configuration. To use the system in a double- sided configuration, it must be positioned over two separate rollers. A CyClean-R system includes the Meech Air Handling Unit (AHU) which incorporates the filtration for the system and provides the vacuum pressure and blowing pressure airflows.
  • Page 10: How Cyclean-R Works

    How CyClean-R Works CyClean-R delivers consistent removal of dry, unbonded contamination from the web surface (particle removal to 0.5 micron is achievable). The process is achieved from a combination of steps: 1. The web passes through a cloud of ionisation on web entry of CyClean-R. The cloud of ionisation is created by the 924IPS bars included, which neutralises any static charges.
  • Page 11: Installation Procedure

    Installation Procedure CAUTION Meech CyClean-R web cleaning systems should only be used in installations for which they are designed. If the CyClean-R is used in any other way than instructed in this manual, it will be considered improper use. CyClean-R Configurations IMPORTANT Carefully read the installation instruction relevant to the CyClean-R system before installation.
  • Page 12 Narrow Web : Fixed End-Feed System Design Fixed Ducting Feed End-Feed Width Range 200mm - 699mm Opening range Narrow Web : Fixed Tab-Feed System Design Fixed Ducting Feed TAB-Feed Width Range 200mm – 699mm Opening Range Narrow Web : Manual System Design Manual Lift Opening Ducting Feed...
  • Page 13 Narrow Web : Manual System Design Manual Tilt Opening Ducting Feed Top-Feed Width Range 200mm – 699mm Opening Range Maximum 40mm from closed position Narrow Web : Pneumatic End-Feed System Design Pneumatic Ducting Feed 1 x End Feed Width Range 200mm-699mm Opening Range 0mm-30mm...
  • Page 14 Mid Web : Fixed End-Feed System Design Fixed Ducting Feed 2x End-Feed Width Range 700mm -1299mm Opening Range Mid Web : Fixed Tab-Feed System Design Fixed Ducting Feed 2x Top-Feed Width Range 700mm -1299mm Opening Range Mid Web : Pneumatic End-Feed System Design Pneumatic Ducting Feed...
  • Page 15 Mid Web : Pneumatic Tab-Feed System Design Pneumatic Ducting Feed 2 x Top Feed Width Range 700mm-1299mm Opening Range 0mm-30mm Wide Web : Fixed System Design Fixed with carapace, for enhanced rigidity at larger widths Ducting Feed Ducting Feed End-Feed Width Range Width Range 1300mm - 4000mm Opening Range...
  • Page 16: Suggested Order Ot Installation

    In general, the CyClean-R system should be installed as close to the critical process as possible to minimise the potential of re-contaminating the web via airborne contamination. Meech would recommend between 1-3mm over the web; however, this may differ depending on the application.
  • Page 17 General Mounting Instruction INFORMATION The images below are for illustration purposes only and the style of your system may differ. Please refer to the Appendices for technical drawings, showing the mounting positions for each style of CyClean-R Please follow the steps below for instruction on how to mount the CyClean-R manifold: 1.
  • Page 18 Fixed CyClean-R Mounting Fixed CyClean-R up to 1300mm Web widths up to 1300mm will be similar to the CyClean-R below. Web widths over 1300mm use a carapace and will be mounted differently.
  • Page 19 Fixed Carapace CyClean-R Mounting Fixed CyClean-R Carapace...
  • Page 20 Manual CyClean-R This opening method is standard for systems that feed the ducting into the end of the CyClean-R head for a maximum web width of up to 600mm. This option is not available for web widths over 600mm. CAUTION Care needs to be taken when placing this style of head upside down due to the way it hinges and it causing a potential pinch point.
  • Page 21 Mounting Manual TAB Feed CyClean-R CAUTION Ensure the latch is secure before installation to reduce the risk of injury.
  • Page 22 IN IS THE PROPERTY OF MEECH INTERNATIONAL AND SHOULD NOT BE COPIED IN WHOLE OR USED FOR MANUFACTURE OR OTHERWISE DISCLOSED WITHOUT THE PRIOR WRITTEN CONSENT OF MEECH INTERNATIONAL. MEECH STATIC ELIMINATORS LTD 2020 ND THE INFORMATION THEREIN IS THE PROPERTY OF MEECH INTERNATIONAL AND SHOULD NOT BE COPIED IN WHOLE OR USED FOR MANUFACTURE OR OTHERWISE DISCLOSED WITHOUT THE PRIOR WRITTEN CONSENT OF MEECH INTERNATIONAL.
  • Page 23 Pneumatic CyClean-R Carapace This opening method is standard for systems suitable for a web width range of 1300mm to 4000mm. This option can be installed so that the system opens up at any angle around a roller. The moving part of the head can be controlled locally or remotely to allow full line integration.
  • Page 24: Pneumatic Connection

    Pneumatic CyClean-R systems are supplied with a pneumatic control box and a 5m length of 6mm blue/black dual core airline to connect the manifold to the pneumatic box. Meech does not supply airline to connect the pneumatic box to the main air supply.
  • Page 25 Mounting Pneumatic Control Box Connecting to Pneumatic Control Box Number Description IEC Power Connection Socket, IEC Cable Supplied with Flying Lead On/Off Switch Auxiliary Gland Air Out 1 (Blue Airline), Connection from CyClean-R 6mm Push-In Air Fitting Air Out 2 (Black Airline), Connection from CyClean-R 6mm Push-In Air Fitting Air In, Connection from Main Air Supply 6mm Push-In Air Fitting...
  • Page 26 WARNING Compressed air can cause serious injury. It is important the air supply is not on or pressurised before connecting the main air supply. Ensure all air line between the manifold and pneumatic box is connected correctly before turning on air supply . The blue/black airline provided connected to the pneumatic cylinders on the CyClean-R manifold to the pneumatic control box.
  • Page 27 Connecting Remote On/Off Signal from the Line Connect a normally open (NO) signal from the line in the CyClean control box as shown in the image below and consult the wiring diagram at the end of this document.
  • Page 28: Positioning Of 924Ips Bars

    YRIGHT © MEECH STATIC ELIMINATORS LTD 2020 DOCUMENT AND THE INFORMATION THEREIN IS THE PROPERTY OF MEECH INTERNATIONAL AND SHOULD NOT BE COPIED IN WHOLE OR USED FOR MANUFACTURE OR OTHERWISE DISCLOSED WITHOUT THE PRIOR WRITTEN CONSENT OF MEECH INTE...
  • Page 29 Electrical Installation WARNING The 924IPS requires a grounded 24V DC supply. The 0V line must be connected to ground. Failure to do so, will result in damage to the bar or the 24V supply and will void the warranty . Power Supply 24 V DC 924IPS...
  • Page 30: Connecting To Power Supply

    Connecting to Power Supply Connecting to Meech Power Supply Meech 24V DC supplies are grounded internally. It is important that the mains connection offers a ground connection. Two-pin outlets without a ground connection must not be used. Connecting to Customer’s Power Supply It is the customer’s responsibility to check that the 24V power supply they will be using is grounded.
  • Page 31: Positioning Of Air Handling Unit

    Positioning of Air Handling Unit WARNING Keep a minimum distance of at 0.5m is kept around the Air Handling Unit (AHU) to permit proper airflow required for ventilation. Restricting airflow can damage the equipment. When positioning the Air Handling Unit, it is important to ensure the ducts being used reach the CyClean-R manifold.
  • Page 32: Ducting

    Meech does not supply ducting with CyClean-R systems. This can be purchased separately. Meech offers a standard ducting kit suitable for the system ordered. The kit comes in various lengths dependant on the CyClean-R web width. The kits offered as standard are specified below.
  • Page 33 Connecting the Ducting The CyClean-R manifold is designed with three pressure chambers, the two outer chambers are vacuum pressure and the central chamber is positive pressure. It is vital all ducting is connected to the correct chamber from the Air Handling Unit to the CyClean-R manifold. CAUTION Ducting configurations will differ depending on CyClean-R system purchased.
  • Page 34 All ducting kits supplied by Meech will include hose clamps, to secure the flexible ducting to the equipment. 1. Place the hose clamp over the flexible ducting and then slide the ducting over the spigot on the CyClean-R manifold.
  • Page 35: Operating The Cyclean-R

    Operating the CyClean-R Before Use Before using the CyClean-R system it is important that you have read and fully understand this manual. IMPORTANT Testing of the system is recommended before it is used for full production System Setup The net airflow into either side of the CyClean-R head is adjusted by bleeding off a volume of the blowing (positive) airflow to create an airflow bias in favour of vacuum.
  • Page 36 Once the bleed valve has been set, ensure the knurled screw is tightened. CAUTION It is recommended that you monitor the system when it is first installed. If any problems are found, please stop using the CyClean-R system and contact Meech International or your local distributor.
  • Page 37: Manual Cyclean-R

    Manual CyClean-R Opening the Manual End-Feed CyClean-R To open the CyClean-R manifold, pull up on the latch until it releases from the latch keep. Once the latch is released, open the CyClean-R. CAUTION Ensure the CyClean-R manifold is always suppoted. Failure to do so can result in serious injury.
  • Page 38 Opening the Manual TAB-Feed CyClean-R To open the CyClean-R manifold, pull out the latch handle. Once the latch is released, rotate the CyClean-R towards the latch. CAUTION Ensure the CyClean-R manifold is always suppoted. Failure to do so can result in serious injury.
  • Page 39: Pneumatic Cyclean-R

    Pneumatic CyClean-R Operating Pneumatic Control Box The pneumatic control box has two push buttons which are used to control the movement of the pneumatic cylinders on the CyClean-R manifold. Each button has a different function: 1. Auto Mode –When Auto Mode is activated, the button will be illuminated blue. The pneumatic control box can be connected to the users PLC, which can be used remotely to activate the pneumatic cylinders on the CyClean-R manifold.
  • Page 40 Adjusting Air Pressure There is a pressure relief regulator valve inside the CyClean pneumatic control box. Adjusting this valve will retrict the air pressure that will be fed to the cylinders of the opening mechanism. To adjust, see the following steps: 1.
  • Page 41 If you need to adjust the pressure relief valve, make sure that it is not adjusted to an excessive level. Excessive pressure may result in damage to your system. INFORMATION This valve will have been set at Meech before your system was supplied.
  • Page 42 Adjustment of Head Opening / Closing Speed The speed/force at which the CyClean-R head opens and closes can be independently adjusted. This will be adjusted by Meech before your system is supplied so that: • Open = medium to fast operation •...
  • Page 43: Commissioning

    COPYRIGHT © MEECH STATIC ELIMINATORS LTD 2020 THIS DOCUMENT AND THE INFORMATION THEREIN IS THE PROPERTY OF MEECH INTERNATIONAL AND SHOULD NOT BE COPIED IN WHOLE OR USED FOR MANUFACTURE OR OTHERWISE DISCLOSED WITHOUT THE PRIOR W ELIMINATORS LTD 2020...
  • Page 44: Troubleshooting

    Model A924 DC ionising bars, which can be downloaded directly from the Meech website at www.meech.com If the problem being experienced is not listed above, or the remedy is unclear, please contact Meech International directly or your local Meech distributor.
  • Page 45: Maintenance And Inspection

    Maintenance and Inspection IMPORTANT Always make safe the electrical and compressed air supplies before undertaking any maintenance work on the CyClean-R system. Inspection The system will perform without serious deterioration, giving many years of service, providing the following visual inspections are made weekly: Head Unit Check for any external damage and the alignment of the head unit.
  • Page 46: Maintenance

    International directly or your local Meech distributor. Fault Finding Fault finding guides for the Meech Model A924 DC ionising bars can be downloaded directly from the Meech website at www.meech.com For further fault-finding guidance please contact Meech International directly or your local Meech distributor.
  • Page 47: Spare Parts

    Spare Parts It is recommended that only Meech spare parts are used in your CyClean-R system. The use of non-Meech parts may invalidate your warranty. For details of spare parts, please contact Meech or your nearest Meech distributor. Please quote the serial number of your CyClean-R system when ordering spare parts.
  • Page 48 Meech International Meech Static Eliminators USA Inc Meech Elektrostatik SA Meech CE 1298 Centerview Circle Kaiserbaracke 166 Gábor László utca 2 2 Network Point Range Road, Witney Akron, OH 44321 B-4780 St.Vith Budapest 1041 OX29 0YN, UK Belgium Hungary Tel: +44 (0)1993 706700...

Table of Contents