Download Print this page

OTS HULK Installation Manual page 2

Advertisement

IMAGE 2
NOTES:
A- If the cable is tight-lined, remove at least 2 joints of clamps and inspect cable.
a. Continue pulling out and removing clamps until no cable armor appears to
have shifted or tightened around the leads.
b. If any armor has shifted, consult the Service company Service company's
Technician for recommendation for repair or replacement of cable.
B- If Installation takes longer than 30 seconds, Stop the installation and ensure unit is
installing properly and the clamp is fit to perform.
a. If no obvious sign of improper installation or clamp malfunction, remove clamp
and send back to OTS for product review.
DO YOU HAVE ANY QUESTIONS OR COMMENTS?
CONTACT US @ Engineering@Oiltoolsolutions.com.
IMAGE 3

Advertisement

loading