Download Print this page

Advertisement

Quick Links

HULK INSTALLATION MANUAL
1- Open clamp collars and install the cable / Cap lines, pull clamp to tubing. Image 2
* Ensure that the clamp is centered over collar to ensure even cable grip.
2- Swing the collars shut, rotate the bolt into the slot on the collar and torque bolts to
30ft/lbs. (Use Impact sockets that meet or exceed ASME B107.110). Gap should
resemble Image 3, do not over tighten as this may cause damage to the cable.
3- Ensure cable and cap lines are installed and tightened with no damage.
4- Ensure cable does not slack between joints to reduce excessive cable exposure to
casing.
5- Installation time is typically less than 15 seconds.
FOR DELIVERY/PICKUP/REFURBISHMENT, CONTACT YOUR OTS
REPRESENTATIVE @
CustomerService@OilToolSolutions.com
1- COLLAR - Holds Clamp to Tubing
2- HINGE PIN - HINGE PIN
3- BODY - Protects Cable and Cap Line
4- WASHER - Stops Bolt from Backing out
5- BARREL - Holds and Tightens Bolts
6- BOLT - 11mm Hex Head

Advertisement

loading

Summary of Contents for OTS HULK

  • Page 1 3- Ensure cable and cap lines are installed and tightened with no damage. 4- Ensure cable does not slack between joints to reduce excessive cable exposure to casing. 5- Installation time is typically less than 15 seconds. FOR DELIVERY/PICKUP/REFURBISHMENT, CONTACT YOUR OTS REPRESENTATIVE @ CustomerService@OilToolSolutions.com...
  • Page 2 If no obvious sign of improper installation or clamp malfunction, remove clamp and send back to OTS for product review. DO YOU HAVE ANY QUESTIONS OR COMMENTS? CONTACT US @ Engineering@Oiltoolsolutions.com.