Download Print this page

zappi -2H07TB-G Quick Install Manual

Eco-smart ev charge points
Hide thumbs Also See for ZAPPI-2H07TB-G:

Advertisement

Quick Links

Electric Vehicle (Smart Charge Points) Regulations 2021
From 30th June 2022, any EV charger installed in a private setting i.e. home or workplace NOT public, in England, Scotland
and Wales has to meet the Electric Vehicles (Smart Charge Points) Regulations 2021.
From 30th December 2022, further regulations come into force.
To ensure all our
are compliant by the date the regulations come into force we will be taking a phased approach with
the implementation of certain features.
For information on how these new regulations may affect you and your
Installation Manual which can be found in the Download Centre on the
Technical Support
If you experience any issues during or post set-up, please contact our technical support team by scanning the QR Code
below.
Please contact us directly for the quickest solution.
Below is your unique product identifier
Please register your new
https://myaccount.myenergi.com/registration
Installation Date:
Installer Contact Details:
please refer to the full
website.
device at
eco-smart EV charge points
Quick Install Guide
This document covers the following models:
Single phase: ZAPPI-2H07TB-G, ZAPPI-2H07TW-G, ZAPPI-2H07UB-G, ZAPPI-2H07UW-G
Three phase: ZAPPI-2H22TB-G, ZAPPI-2H22TW-G, ZAPPI-2H22UB-G, ZAPPI-2H22UW-G `
When installing and wiring the
Ensure that the grommets and bungs provided are fitted, the O-ring behind the cover is seated correctly and that the
electricity cable and CT wires are fitted using an appropriate size and type of gland of at least IP65.
Overview
with model number beginning 2H have a built-in Ethernet port (RJ45 socket) and WiFi to connect to the local
network (LAN). They also come with built-in
your
devices to the internet or use the
These install instructions should be read in conjunction with the
Download Centre of the
website.
Step 1:
Remove
from its
packaging and keep all CT's and
fixing kit to one side. CT's and
fixing kit are enclosed within the
cardboard packaging.
Single Phase - 1 CT, Three Phase - 3 CTs
Step 3:
If installing a tethered
you will need to fit the
enclosed cable wall guard to the
unit using the
4x 4mm x12mm
screws supplied.
Step 5:
Using the enclosed template
mark all the mounting holes required.
· Use top and 2 bottom holes left /
right for brick (use 7mm dia. Masonry
drill and the wall plugs provided.
· Use 3 vertical holes if mounting to a
stud wall or joist.
UNITED KINGDOM
Revision 2.1.2, November 2022
NOTICE
care should be taken to maintain the IP rating of the unit.
functionality (
) which means you don't need a separate hub to link
app.
Installation Manual which can be found in the
Step 2:
Unscrew the cover and unclip
flat ribbon cable.
· If fitting an untethered
protect
the cover whilst it hangs down during
installation.
· If tethered, unclip the ribbon cable and set the cover
aside.
Step 4:
There are 4 possible cable entry
positions, carefully decide which one you are
going to use from this image.
You will need
an IP65 or above rated cable gland.
Carefully drill hole into unit to match the size
of your cable gland. Attach cable gland
ensuring IP rating is maintained.
Step 6:
To maintain the IP rating of
the unit you must ensure that the bungs
provided are inserted in any mounting
holes that are not used.
D3405

Advertisement

loading

Summary of Contents for zappi ZAPPI-2H07TB-G

  • Page 1 This document covers the following models: Technical Support Single phase: ZAPPI-2H07TB-G, ZAPPI-2H07TW-G, ZAPPI-2H07UB-G, ZAPPI-2H07UW-G If you experience any issues during or post set-up, please contact our technical support team by scanning the QR Code Three phase: ZAPPI-2H22TB-G, ZAPPI-2H22TW-G, ZAPPI-2H22UB-G, ZAPPI-2H22UW-G ` below.
  • Page 2 CTs you want to use (Unless you have other on each phase that you Rules must be followed for the zappi to work correctly. · Hold down the spring connectors and push the CT cables into the blocks.