Installation & Operation - New Air NPT-029-SA Product Manual

Sandwich/salad prep tables, regular & mega top
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
& OPERATION
INSTALLATION
Installation
After unpacking, check the cabinet for any damage caused during transportation. In the event of
damage, please contact the freight company immediately.
Allow the refrigerator to stand upright for at least 1 hour prior to connection to the main electrical
supply. This gives the oil time to run back to the compressor after transit and installation.
Always ensure that your refrigerator is installed on level floor.
Main connection: If the main cord supplied is not long enough, do not use an extension cord. Ask a
technician to install a socket near the refrigerator.
Ensure that there is enough space between the back side of the refrigerator and the wall, and that
nothing is placed on top of the refrigerator. Allow a minimum gap of 100mm at the rear and 50mm
at the sides of the cooler.
Connection to the main supply
Connect the refrigerator to a 115 Volts, 60Hz power supply on a min 15A fused & grounded sock-
et. Do not use extension cables. If the power cord is not long enough, ask an authorized electrician
to replace it with a longer one, or to install a socket near the refrigerator.
Do not compress the main cable.
General user information
The thermostat is located on the inside of the refrigerator. The thermostat is factory set to approx.
0~7.2°C. If you require a higher temperature (warmer), turn the thermostat knob anticlockwise. If
you require a lower temperature (colder), turn the thermostat knob clockwise.
8
New Air Refrigeration
NPT-SA/-MSA Series: Installation & Operation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents