Fig. 31: Dismantling The Gas Outlet Flange; Table 32: 3 Press-Off Screws - ABB HT845551 Operation Manual

Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-H.. - A140-H
8 Dismantling and fitting / 8.5 Removing the gas outlet flange
Gas outlet flange with 3 press-off screws
CAUTION
Cracks in the gas outlet casing
Non-observance of the action steps described can lead to inadmissible
cracks on the gas outlet flange.
Observe the maximum tightening torques when pressing off.
u
Follow the action steps described.
u
Only dismantle the gas outlet flange if this is necessary for service work.
If necessary: Treat the centering seat with rust remover through the press-off threads
u
and the clearance holes.
Mark the casing position for assembly.
u
Fig. 31: Dismantling the gas outlet flange
Product
A130
A135
A140
Table 32: 3 press-off screws
* not included in the ABB Turbo Systems scope of delivery
1. Press off and remove the gas outlet flange (57002) with screws (01) according to the
table. If it is not possible to press off the gas outlet flange with the maximum tightening
torque, contact an ABB Turbocharging Service Station.
2. If present: Remove the C-ring (57003).
© Copyright 2020 ABB. All rights reserved.
Press-off screws (strength 8.8) *
3 x M 8 x 20
3 x M10 x 25
3 x M12 x 30
HZTL4030_EN
Tightening torque
≤ 20 Nm
≤ 40 Nm
≤ 65 Nm
Rev.F
February 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

A140-h56

Table of Contents