Hide thumbs Also See for VEUE:

Advertisement

Quick Links

VEUE | WIRE GUIDE
INSTALLATION MANUAL
N MANUAL
m Up

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VEUE and is the answer not in the manual?

Questions and answers

Summary of Contents for Betta VEUE

  • Page 1 N MANUAL m Up VEUE | WIRE GUIDE INSTALLATION MANUAL...
  • Page 2: Table Of Contents

    CONTENTS SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED PART A – TOOLS REQUIRED ............................3 PART B – ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED)....................3 PART C – BLIND ITEMS REQUIRED ........................... 3 PART D – BLIND ITEMS REQUIRED ..........................4 SECTION B | INSTALLATION PART A –...
  • Page 3: Section A | Tools And Additional Items Required

    Measuring Tape • Pencil PART B – ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED) To assemble an Veue | Wire Guide, the following non-stocked items are required: • Fixings for Box/Open Brackets/Hardware (ensure appropriate fixings are used to suit application) • Trims to conceal packing (if required) PART C –...
  • Page 4: Part D - Blind Items Required

    SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED PART D – BLIND ITEMS REQUIRED WIRE GUIDE AND FIXING HARDWARE OPTION 1 – Hook Terminal STRAP DOWN HARDWARE SS SADDLE & SWIVEL EYE SHACKLE DIAMOND EYE PAD Page. 4...
  • Page 5: Section B | Installation

    SECTION B | INSTALLATION PART A – PREPARING INSTALLATION STEP 1. - CHECK FOR OBSTRUCTIONS Check for any obstructions that may interfere in installation. STEP 2. - CHECK VERTICAL & HORIZONTAL INSTALLATION DIMENSIONS VERTICAL DIMENSIONS Check if top of installation space is level. •...
  • Page 6: Part B - Box Installation

    SECTION B | INSTALLATION PART B – BOX INSTALLATION STEP 1 – INSTALL BOX TO WALL/CEILING FACE FIX SIDE FIX TOP FIX NOTE: Use appropriate fixings to suit application. Ensure Box is Aligned and Level. Ensure 2 fasteners are used per side. PART D –...
  • Page 7: Part D - Blind Installation

    SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 1 – MARK &SECURE WIRE GUIDE FIXINGS AND TRIM WIRE TO SUIT Wire Centres 19mm OPEN 18mm NOTE: Cut wire to assist installation (ensure wire is not cut too short, excess can be trimmed later) FLOOR FIX FLOOR FIX FACE/SIDE FIX...
  • Page 8 SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 2 – INSERT SPRING ONTO WIRE STEP 3 – ATTACH WIRE AND SPRING TO BRACKET OPTION 1 – HOOK TERMINAL NOTE: Tube hardware not shown for clarity of wire installation Page.
  • Page 9 SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 5 – INSERT WIRE THROUGH WEIGHT BAR STEP 4 – INSERT BLIND INTO BOX END CAP FLOATS NOTE: • Insert control end first • Ensure blind is secure STEP 6 – INSERT CLIP INTO IDLER ADAPTER IDLER END Page.
  • Page 10 SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 7 – FEED THROUGH MOTOR CABLE (FOR MOTOR ONLY) STEP 8 – RUN BLIND DOWN + CENTRE Page. 10...
  • Page 11 SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 9 – TEST BLIND OPERATION For motor operation, ensure wiring is correct and motor is operating correctly. For gear operation, ensure operation is smooth. Once blind is operating correctly, proceed to next steps. Page.
  • Page 12 SECTION B | INSTALLATION PART D – LOCK OFF SS SADDLES & ATTACH DIAMOND EYE PAD CLIPs – IF ORDERED STEP 1 – UNLOCK SADDLES AND SLIDE TO REQUIRED POSITION (SUGGESTED 100MM NOMINAL FROM END CAP), LOCK BOTH SADDLES TO THE BOTTOM RAIL STEP 2 –...
  • Page 13: Part E - Tension Guidelines

    SECTION B | INSTALLATION PART E – TENSION GUIDELINES STEP 1 – SLIDE ADJUSTING SLEEVE THEN WIRE TERMINAL ONTO WIRE AND TIGHTEN UP OUT OF THE NOTE: Use 2mm Allen Key Page. 13...
  • Page 14 SECTION B | INSTALLATION PART E – TENSION GUIDELINES STEP 2 – PULL WIRE STRAIGHT AND ALIGN TERMINAL FLANGE WITH M4 GRUB SCREW, CLAMP TO WIRE FLOOR FIX FACE/SIDE FIX STEP 3 – TIGHTEN REMAINING GRUB SCREWS ON WIRE (TIGHTEN 3X GRUB SCREWS PER WIRE) FLOOR FIX FACE/SIDE FIX NOTE: Use 2mm Allen Key...
  • Page 15 SECTION B | INSTALLATION PART E – TENSION GUIDELINES STEP 5 – SCREW IN ADJUSTING SLEEVE UNTIL WIRE BEGINS TO TENSION FLOOR FIX FACE/SIDE FIX STEP 6 – TO APPLY MIN REQUIRED TENSION, TIGHTEN WITH 5X TURNS USING ALLEN KEY FLOOR FIX FACE/SIDE FIX STEP 7 –...
  • Page 16 SECTION B | INSTALLATION PART E TENSION GUIDELINES STEP 1 – SWING BOX COVER INTO BOX TOP AND CLIP INTO PLACE STEP 2 – SECURE COVER AT BOTH ENDS Note: It is recommended that the Box Cover be fixed to ensure it is not accidentally dislodged. Page.
  • Page 17 SECTION B | INSTALLATION PART E– TENSION GUIDELINES OPEN Page.17...
  • Page 18: Section C | Troubleshooting

    SECTION C | TROUBLESHOOTING PROBLEM CAUSE SOLUTION This occurrence is inherent to roller systems and is more Blind rolled up for an extended period of time. prevalent in some fabrics. Leave blind down for 1 – 4 hours; most ripples should disappear. Ripples along sides of fabric Refer to Product Specs.

Table of Contents