Betta VEUE Installation Manual

Straight drop
Hide thumbs Also See for VEUE:

Advertisement

Quick Links

VEUE | STRAIGHT DROP
INSTALLATION MANUAL
N MANUAL
m Up

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VEUE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Betta VEUE

  • Page 1 N MANUAL m Up VEUE | STRAIGHT DROP INSTALLATION MANUAL...
  • Page 2: Table Of Contents

    CONTENTS SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED PART A – TOOLS REQUIRED ............................3 PART B – ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED)....................3 PART C – BLIND ITEMS REQUIRED ..........................3 SECTION B | INSTALLATION PART A – PREPARING INSTALLATION SPACE ........................4 PART B –...
  • Page 3: Section A | Tools And Additional Items Required

    Mallet • Scissors PART B – ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED) To install a VEUE | Straight Drop, the following non-stocked items are required: • Fixings for Box/Open Brackets/Hardware (ensure appropriate fixings are used to suit application) • Trims to conceal packing (if required) PART C –...
  • Page 4: Section B | Installation

    Use appropriate fixings to suit application. Ensure Box is Aligned and Level. Ensure 2 fasteners are used per side. Ensure brackets are aligned and level. Measure brackets end to end to confirm measurement is correct. Page. 4 VEUE Straight Drop Installation Manual |...
  • Page 5: Part D - Blind Installation

    SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 1 – INSERT BLIND INTO BOX User effort will be required to push the booster head/Idler pin into the adapter, a noticeable “click” will indicate that the component is correctly located. STEP 2 –...
  • Page 6: Part D - Blind Installation

    SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 3 – FEED THROUGH MOTOR CABLE (FOR MOTOR ONLY) STEP 4 – RUN BLIND DOWN + CENTRE For motor operation, ensure wiring is correct and motor is operating correctly. For gear operation, ensure operation is smooth.
  • Page 7: Part E - Lock Ss Saddles & Atttch Diamond Eye Pad

    SECTION B | INSTALLATION PART E – LOCK OFF SS SADDLES & ATTACH DIAMOND EYE PAD OPTION 1 - CLIP STEP 1 – UNLOCK SADDLES AND SLIDE TO REQUIRED POSITION (SUGGESTED 100MM NOMINAL FROM END CAP), LOCK BOTH SADDLES TO THE BOTTOM RAIL STEP 2 –...
  • Page 8: Part F - Insert Box / Cover

    SECTION B | INSTALLATION PART F – INSERT BOX / COVER STEP 1 – INSERT BOX 120 COVER AS SHOWN, SUPPORT THE EXTRUSION AS REQUIRED TO ENSURE SMOOTH ENGAGEMENT STEP 2 – SECURE COVER AT BOTH ENDS Note: It is recommended that the Box Cover be fixed to ensure it is not accidentally dislodged. Page.
  • Page 9: Part G - Installed Straight Drop

    SECTION B | INSTALLATION PART G – INSTALLED STRAIGHT DROP OPEN Page 9...
  • Page 10: Section C | Troubleshooting

    SECTION C | TROUBLESHOOTING PROBLEM CAUSE SOLUTION Ripples along sides of fabric This occurrence is inherent to roller systems and is more prevalent Blind rolled up for an extended period of in some fabrics. Leave blind down for 1 – 4 hours; most ripples time should disappear.

Table of Contents