Configuration Parameters; Standard Parameters; Global Key Parameters - Metcom Solutions MCS301 Product Manual

Polyphase smart meter
Table of Contents

Advertisement

18 Configuration parameters

18 Configuration parameters
Below configuration parameters can be changed depending on the access.

18.1 Standard parameters

• Demand register 1,2,3,4,7 period
• Demand register 1,2,3,4,7 number of period
• Limiter Threshold Normal
• Limiter Threshold Emergency
• LP1 Capture Period
• LP2 Capture Period
• LP Average Capture Period
• LP Max Capture Period
• LP Min Capture Period
• LP Harmonics Capture Period
• Secret change
• Security policy changed (meter)
• Security policy changed (IHD)
• M-Bus security parameters changed
• Transformer ratio- current
• Transformer ratio- voltage
• Limiter action activated (Attr. 11, IC 71, changed to any action)
• Limiter action deactivated (Attr. 11, IC 71, changed to any action)
• Minimum Time Under Threshold
• Minimum Time Over Threshold
• Time Threshold for Under Voltage Detection
• Time Threshold for Over Voltage Detection
• Threshold for Under Voltage Detection
• Threshold for Over Voltage Detection
• Time Threshold for Missing Voltage
• Threshold for Missing Voltage
• Time threshold for long power failure

18.2 Global key parameters

• Authentication Key for meter change
• Encryption Unicast key for meter change
• Encryption Broadcast key for meter change
• Authentication Key for IHD change
• Encryption Unicast key for IHD change
• Master Key Change
• Authentication Key for Local Port
• Encryption Unicast Key for Local Port
MCS301 meter - product Manual 1.25
Page 91 of 142
MetCom Solutions GmbH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MCS301 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF