GE Multilin 350 Operation & Maintenance Manual page 147

Table of Contents

Advertisement

Perimeter
bolting
Front
The center-post bolting has to be done at 2 places in the front upper compartment and at
two places in the front bottom compartment. The 3.25 inch long bolts may be used where
it is required to bolt through the red glastic sheet shown in the upper portion of Fig A(2)–
2.
Factory connections
Fig A(2)-1
Sectional view of inter-unit bolting
Fig A(2)-2
Typical Center-post bolting
Perimeter
bolting
Center-post ( 4 places)
Rear
Center-post bolting
59

Advertisement

Table of Contents
loading

Table of Contents