Southwire Sumner GH2T-3 Operator's Manual
Southwire Sumner GH2T-3 Operator's Manual

Southwire Sumner GH2T-3 Operator's Manual

Gantry lift

Advertisement

Quick Links

USA
7514 Alabonson Road
Houston, Texas 77088
phone: 281.999.6900
fax: 281.999.6966
© Sumner Manufacturing Company, LLC. All rights reserved. * Trademark of Sumner Manufacturing Company, LLC.
OPERATOR'S MANUAL
GH2T Gantry Lift
CANADA
75 Saltsman Drive, Unit 5
Cambridge, ON N3H 4R7
phone: 519.653.5300
fax: 519.653.5305
*
NETHERLANDS
Midden Engweg 21
NL-3882TS Putten
Netherlands
europeansales@sumner.com
phone: +31 (0) 85 489 0284
July 2017
UNITED KINGDOM
Unit 3 Kempton Road
Keytec 7 Business Park
Pershore, Worcestershire
WR10 2TA, UK
phone: (44) 01386 556278
fax: (44) 01386 556776

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sumner GH2T-3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Southwire Sumner GH2T-3

  • Page 1 July 2017 OPERATOR’S MANUAL GH2T Gantry Lift CANADA UNITED KINGDOM NETHERLANDS 7514 Alabonson Road 75 Saltsman Drive, Unit 5 Unit 3 Kempton Road Midden Engweg 21 Houston, Texas 77088 Cambridge, ON N3H 4R7 Keytec 7 Business Park NL-3882TS Putten phone: 281.999.6900 phone: 519.653.5300 Pershore, Worcestershire Netherlands...
  • Page 2: Table Of Contents

    Index Introduction ..................3 Gantry Components ................3 Operator Safety Instructions ...............3 GH2T Gantry Lift Assembly ............3-6 1. Erect A-Frame ................4 2. Assemble Components ............5-6 Gantry Height Adjustment............... 6-7 1. Unlock casters .................6 2. Adjust lifting handle location .............6 3. Remove locking pins ............6-7 Gantry Span Adjustment..............7 Moving Gantry Lift ................7 GH2T Gantry Specifications ...............8...
  • Page 3: Introduction

    Introduction 8. NEVER stand under an elevated load. 9. NEVER exceed rated load capacity. Thank you for choosing Sumner’s GH2T Gantry Lift 10. NEVER operate during high winds or electrical to meet your material lifting needs. The GH2T Gantry storms. Lift has a load capacity of 2 metric tons (2,000 kg) or 11.
  • Page 4: Erect A-Frame

    1. Erect A-Frame Begin with the A-frames lying flat on the ground. Assemble Gantry following instructions below. 1. To extend one leg push the red leg locking button. 4. Casters can be locked at 90 degree angles to make The leg is now free to extend. transport easier.
  • Page 5: Assemble Components

    2. Assemble Components 1. Lay out cross beam in a cleared area. Place one A- frame at either end of the cross beam as shown. 2. Lift one side of cross beam onto A-frame and line 5. Place bolt through bolt hole on A-frame and cross up outside bolt hole on A-frame with desired bolt beam with washers on either side of the bolt.
  • Page 6: Gantry Height Adjustment

    2. Adjust lifting handle location Release the plunger pin on the lifting handle and slide handle to desired position most convenient for lifting or lowering A-frame height. Release plunger pin and be certain it locks into place through pre-set holes before 7.
  • Page 7: Gantry Span Adjustment

    sary to adjust the span symmetrically on either end of the beam. Moving Gantry Lift CAUTION It is not recommended to move Gantry lift with a load. When moving Gantry lift with a load be sure to secure trolley in center of cross beam and lower load as close to the ground as possible prior to moving.

This manual is also suitable for:

Sumner gh2tSumner gh2t-4Sumner gh2t-5Sumner gh2t-15Sumner gh2t-12Sumner gh2t-10 ... Show all

Table of Contents