Introduction 8. NEVER stand under an elevated load. 9. NEVER exceed rated load capacity. Thank you for choosing Sumner’s GH3/4T Gantry Lift 10. NEVER operate during high winds or electrical to meet your material lifting needs. The GH3/4T Gantry storms. Lift has a load capacity of 3/4 metric tons (750 kg) or 11.
1. Erect A-Frame Begin with the A-frames lying flat on the ground. Assemble Gantry following instructions below. 1. To extend one leg push the red leg locking button. 4. Casters can be locked at 90 degree angles to make The leg is now free to extend. transport easier.
2. Assemble Components 1. Lay out cross beam in a cleared area. Place one A- frame at either end of the cross beam as shown. 2. Lift one side of cross beam onto A-frame and line 5. Place bolt through bolt hole on A-frame and cross up outside bolt hole on A-frame with desired bolt beam with washers on either side of the bolt.
2. Adjust lifting handle location Release the plunger pin on the lifting handle and slide handle to desired position most convenient for lifting or lowering A-frame height. Release plunger pin and be certain it locks into place through pre-set holes before 7.
Moving Gantry Lift CAUTION It is not recommended to move Gantry lift with a load. When moving Gantry lift with a load be sure to secure trolley in center of cross beam and lower load as close to the ground as possible prior to moving. Move lift by pushing the Gantry, not the load.
GH3/4T GANTRY SPECIFICATIONS Stored Max/Min Height Height Span Width Height Height To To Top Of Span Between Adjust- Adjust- Of "A" of "A" Part No. Gantry Model Lifting Eye Trolley Working Span Wheels ment ment* Frame Frame 785301 GH3/4T-15 (15' / 8"casters) 154"...
This manual is also suitable for:
Sumner gh3/4t-12Sumner gh3/4t-10Sumner gh3/4t-8Sumner gh3/4t-3Sumner gh3/4t-4Sumner gh3/4t-5...
Show all
Need help?
Do you have a question about the Sumner GH3/4T-15 and is the answer not in the manual?
Questions and answers