Page 1
INSTALLATION AND OPERATING INSTRUCTIONS BT 50...
Page 2
Thank you for choosing a DOMUSA TEKNIK product. From the range of DOMUSA TEKNIK products you have chosen a BT, a primary buffer that along with a heat pump of the DUAL CLIMA line, is able to provide the level of comfort suitable for your home with balance and savings.
2.3 Installation The BT 50 tank can be assembled in many ways (Horizontal, Vertical, Wall hung, Floor Standing, Ceiling Hung, etc.). The brackets (mounted), legs and the necessary accessories for installation in any of the following installation examples are provided with the tank:...
BT 50 2.3.1 Wall and Ceiling hung Horizontal Vertical Make 4 holes according to the dimensions and place the appropriate fixings, depending on the weight of the tank and type of wall. Leave the fittings loose until the tank is suspended.
The BT 50 tank has two sockets (E ) to connect an auxiliary electrical heater for the heating circuit. DOMUSA TEKNIK supplies a 1.5, 2.5 or 3.5 kW electrical heater as an option. For installation, please read carefully the assembly instructions supplied with them.
BT 50 4 START-UP In order to valid the guarantee, the heat pump must be started up by personnel authorized by DOMUSA TEKNIK. Before beginning the start-up process, check that: - The installation must be filled with water and well vented.
Page 12
Bº San Esteban s/n 20730 AZPEITIA 20737 RÉGIL (Guipúzcoa) Tel: (+34) 943 813 899 Fax: (+34) 943 815 666 www.domusateknik.com DOMUSA TEKNIK, reserves the right to make modifications of any kind to its product *CDOC001778* characteristics without prior notice. CDOC001778 03/18...
Need help?
Do you have a question about the BT 50 and is the answer not in the manual?
Questions and answers