Post Processing; Setup Flow Chart - 3DATX parSYNC User Manual

Minipems
Table of Contents

Advertisement

Disconnect sample lines and drain water traps. Leave system pump on to purge approximately 30
minutes. Remove condensate from traps and store at room temperature after sealing unit for next
use.
Turn off parSYNC® & CUBE™ with on/off buttons: Turn off heater on grey temperature panel, turn
off pump and sensor electronic using silver ON/OFF button
Plug both chargers into both heater and pump battery connections. Charge batteries in parSYNC® &
CUBE™ overnight (5-6 hrs. or overnight). Indicator lights show charging with red and full charge
with green.
Charge tablet

5.5 Post Processing

Data is written as a *.csv file. Follow the shortcut to parSYNC Data directory, C:\parSYNC\testdata\

6 Setup Flow Chart

24

Advertisement

Table of Contents
loading

Table of Contents