Page 1
Power Bank 300 XL 300W Inverter with 300W MPPT Charge Controller and 1kWh Lithium Battery Bank position of AC and DC is not correct USER MANUAL Global Tech China Ltd, 3 Floor, Wai Yip Industrial Building.171 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong.
PCM card protects each battery card. The PB 300 XL can operate at any time of the day and be set to ‘automatic’ mode, in which it operates only at night or when power is required. It can either operate 24hrs or be set in the UPS mode, where it operates only at night or where power cuts out.
2. PB 300 XL COMPONENTS position is not correct position of AC and DC is not correct Power Bank 300 XL 2 x 125W Solar Panels & Fixings 2 x Lithium Battery Packs 2 x 100W Total (1kWh) Also includes: ...
Can be used on large marine vessels for uninterrupted power supply Security Floodlighting (over 5 hours): 2 x 100W 2 x 125W solar panels 1 x PB 300 XL (1kWh) 5 x 20W LED security floodlights Classroom Pack (over 4 hours) 2 x 100W...
Total Harmonic Distortion 230V Output Voltage 220VAC Output Power 300W Output Frequency 50Hz Connection Type Sunsynk / MC4 Efficiency Peak Efficiency > 90% Product Size 46cm x 33cm x 13cm Net Weight 13.5 kg Operating Temperature -20 to +50 °C...
5.2. Mounting the System 1. Install the solar panels using the L brackets provided and connect the cables to the PB 300 XL. 2. Mount the PB 300 XL onto a non-flammable wall.
6. WIRING When assembling a solar power system using the PB 300 XL, it is necessary to attach cables 3-way (AC) connectors and for the DC MC4 connectors are used. The following is an assembly instruction for both AC/DC connectors.
“Beep beep beep beep beep…beep beep beep beep beep” – System short-circuit indication. Once the PB 300 XL has been fixed into a suitable location, solar panels wired, batteries connected, and AC wired to a fuse board or power block, it is time to turn on the device.
The following instructions should, therefore, be read before any installation takes place: 1. DO NOT attach any part of the PB 300 XL or any system that it is part of, to mains grid supply. 2. When installing any system using the PB 300 XL, ensure a certified electrical engineer is present to check the system is assembled correctly and safely.