Page 1
GH1246 Please read these instructions carefully before beginning assembly. Check all parts against the part list, making sure you have everything you need before you begin. Please ensure you carry out the installation as per the steps laid out in these instructions.
Page 2
We strongly recommend the use of work gloves, shoes and safety goggles during assembly. Do not attempt to assemble the greenhouse in wet or windy conditions. Take care to avoid hazards such as overhead power cables during installation. The greenhouse parts may be wrapped in plastic, small parts may be in plastic bags, take care to keep these away from children.
Page 4
Polypannel List and Installation Plan When installing polypannels, please ensure the side with the white film is facing out. This is the side with UV protection. Also it is advisable to peel the film off, just before installing the panel. Installation of Bolts: 1.Slide bolt into the channel in the aluminium profile.
Page 6
Preparation-These steps will help prepare the parts for use later in the installation Preparation-These steps will help prepare the parts for use later in the installation “Lay parts 4, 5 and 6 on the ground” “Please Note, although some bolts will seem like they have no use at the moment (for example the 2x F4 bolts in each part 12), they do have a use later in the installation and installing them now will save time later on.”...
Page 10
“At this point it is helpful to use a ladder to support the frame whilst you continue with the installation.”...
Page 12
Please ensure part 8 is installed this way up Please ensure the lip on part 8 sits on top of part 7.
Page 14
Please ensure 1 extra F4bolt and nut is placed in each part 18 for use later...