Download Print this page

GE GFDN240GLWW Installation Instructions Manual page 2

Frontload dryer
Hide thumbs Also See for GFDN240GLWW:

Advertisement

TURN GAS
DISCONNECT AND DISCARD OLD
FLEXIBLE GAS CONNECTOR AND
SHUT-OFF
OLD DUCTING MATERIAL.
VALVE TO THE
REPLACE WITH NEW CSA(AGA)
OFF POSITION.
APPROVED FLEXIBLE GAS LINE
CONNECTOR AND UL APPROVED
TRANSITION DUCT.
INTERNAL DUCT
OPENING
WALL
CHECK THAT EXHAUSE
HOOD DAMPER OPENS
AND CLOSES FREELY.
TILT THE DRYER SIDEWAYS
AND REMOVE THE FOAM
SHIPPING PADS BY
PULLING AT THE SIDES
AND BREAKING THEM
AWAY FROM THE DRYER
LEGS. BE SURE TO
REMOVE ALL OF THE
FOAM PIECES AROUND
THE LEGS.
2"
3/8" NPT MALE THREAD GAS SUPPLY
2-5/8"
NOTE: Add to vertical dimension
the distance between cabinet
bottom to floor.

Advertisement

loading