1.7. Unpacking and use ................10 2. UPLOADING LEVEL ..................12 3. INSTALLATION OF THE SEMI VERTICAL PLUTON SPACE ....... 13 4. INSTALLATION OF THE PLUTON SPACE ISLAND ........... 21 5. ACCESS TO THE COMPRESSOR IN THE EVENT OF FAILURE ......25 6.
Page 3
ACCESSORIES ..................33 TECHNICAL DATA................. 34 17.1. Technical information ..............34 17.2. Electrical layouts ................34 17.3. Control settings ................34 17.4. Setting of values of the control functions .......... 34 17.5. Failures and troubleshooting ............34 18. MEANINGS OF SYMBOLS ................37...
1. GENERAL INSTRUCTIONS 1.1. Sender information UAB FREOR LT Katiliskiu St. 92, LT - 02212 Vilnius, Manufacturer, Lithuania address Phone +37052329188 Made in Lithuania Customer Installation date Installation place Start of the product operation [PLACE FOR PRODUCT LABEL]...
Page 5
• The user instruction of the semi vertical Pluton Space has to be kept at the place of operation. It must be available to technical staff, service personnel and repair specialists at any time of the day.
1.3. Packaging and its dismounting Size 10 15 min Unload the semi vertical; Unscrew the self- cutting screw M6x100 ISO 7380; Remove the unit from the pallet;...
The refrigeration system may be operated only by maintenance personnel authorized and trained by FREOR LT to work with flammable and fluorinated refrigerants. Opening of the refrigerant circuit and pumping of the refrigerant are allowed only in the well-ventilated rooms or outdoors.
Products may not cover the air circulation channels. 1.6. Intended use The semi verticals Pluton Space are intended to be used for display of cooled products. The semi vertical Pluton Space is foreseen for maintaining of average temperature (0..+10°C) in the inner space of the semi vertical.
Page 11
1.8. Requirements for setting down of the semi vertical When setting down the unit pay attention to the following issues: • The unit must be aligned horizontally in all directions (depth, length) and stably set down. • At the place of the setting down, avoid draughts and higher heat. Do not set down the equipment in front of heating radiators, heaters and near air outlets.
2. UPLOADING LEVEL The semi vertical is equipped with shelves. the maximum allowable loads are specified in the main layout sticker ( example in fig. 3). The sticker is attached to right corner of inner ceiling. It is forbidden to exceed the indicated maximum loads. Fig.
3. INSTALLATION OF THE SEMI VERTICAL PLUTON SPACE Size 17,32 Install plastic legs; Apply silicone and screw the nozzle into the condensate drainage opening;...
Page 14
Unscrew the screw M8x25 DIN 7976 and dismount the transportation profile; Using the front and rear legs, perform horizontal and vertical pre-adjustment of the semi vertical. The leg is adjustable in 5 cm; Using the level, perform horizontal and vertical pre- adjustment of the semi vertical.
Page 15
Insert the guides as shown in the figure; With the adhesive foam tape, seal connection gaps; Apply silicone to seal the connection gaps;...
Page 16
Perform final match of the guides and put together the furniture; To achieve a more robust connection, compress the cabinet legs; Insert threaded rods with washers into the indicated places and tighten them with the wrench. Threaded rod M10x90 ISO 7985;...
Page 17
Insert threaded rods with washers into the indicated places and tighten it with the wrench. Threaded rod M10x90 ISO 7985; Insert threaded rod with washers into the indicated places and tighten it with the wrench. Threaded rod M10x90 ISO 7985; Seal the bottom connection joints with silicone;...
Page 18
Insert the cover onto the indicated place; Take the bracket to install the lower dust cover. Insert the threaded staples as shown in the figure; Secure brackets on the legs;...
Page 19
Secure the threaded staples to the dust cover; Connect the dust covers using the self-cutting screws M4x13 ISO 7380; Put on the dust covers and fasten them with the self-cutting screws M4x13 ISO 7380;...
Page 20
Using a rubber hammer attach the rubber bumper;...
4. INSTALLATION OF THE PLUTON SPACE ISLAND Size 8 Insert the guides as shown in the figure; With the adhesive foam tape, seal connection gaps;...
Page 22
Apply silicone to seal connection gaps; Perform the final match of the guides and put together the furniture; Insert the self- cutting screws M4,8x19 ISO 1479 into indicated places and tighten them using the wrench;...
Page 23
Insert the self- cutting screws M4,8x19 ISO 1479 into indicated places and tighten them using the wrench; Seal the bottom connection joints with silicone; Put on the condensing block on the top of the semi vertical. It is necessary to pay attention to arrangement of the openings on...
Page 24
Attach the condensing block fastening it with the self- cutting screws M4,8x19 ISO 1479; Put on the end dust cover and tighten the self- cutting screws 2x13 ISO 7380; Put on the front dust covers and tighten the self- cutting screws M4x13 ISO 7380;...
6. CONNECTION OF THE POWER SUPPLY INSTRUCTIONS It is necessary to regard and follow requirements of the local power supply company in force in the respective region and the nationally valid and applicable standards as well as safety rules! The network voltage and frequency must match the nominal values indicated on the operating data table of the unit! The main power supply parameters: Nominal voltage: ~400V/50Hz/3ph...
To save energy during non-business hours of the shop, open semi verticals should be covered with curtains. 7.2. Operation • The semi verticals Pluton Space are installed in the shopping premises at a predefined location. • The cabinets have to be interconnected in accordance with the furniture installation manual.
DRAINAGE The semi verticals Pluton Space require condensate drainage. Condensate is drained to the collection tub with the condensate rotary pump. The condensate drainage pumps have to be installed strictly horizontally. Also, condensate drainage can be connected to the common sewerage system.
Page 31
Regular maintenance: • The semi verticals should be cleaned at least once a week. If needed, when damaged packaging is detected, the cabinets have to be cleaned more often. • During cleaning, the internal space, shelves, interior and exterior plastic and glass parts of the semi vertical have to be thoroughly cleaned as well as the floor at the semi vertical have to be washed.
• Make sure that the drainage openings are not clogged and condensate drains freely. • Remove dust, possible residues of food products and the condensate residue from surfaces. • Disinfect the internal space of the semi vertical. • Clean and disinfect detached parts and dry them. •...
After the semi vertical is installed, each showcase and the overall system must be inspected prior their start-up. ACCESSORIES The equipment is supplied with many special accessories, such as partitions, tabs, price holders, drainage collection tub and evaporation baths, safety bumpers, etc. For more information, please call FREOR LT or sales partner.
F and OAM gases. Only an electrician with the respective qualification may carry out inspection and repair of electrical installation. The control informs on faults of the semi vertical Pluton Space. ENABLE ALARM Alarm...
Page 35
Potential reasons Error signal Potential reason Troubleshooting Power supply failure (the Check electrical system does not receive installations, network and power supply). fuses. The temperature of the Remove warm products uploaded products is from the cabinet and higher than the freeze them up to the temperature in the internal necessary temperature in...
Page 36
Check for the phase matching (in the event of changed phases, one- The semi vertical is out Power supply disorders. phase cabinet elements of order. can be operational). Check switches; Check the network. Fluctuations of the Refrigeration cycle electrical network voltage; The compressor is out of disorders;...
Page 40
FREOR LT, UAB Manufacturer of the commercial refrigeration equipment Katiliskiu St. 92, LT - 02212 Vilnius, Lithuania T: +370 5 232 9188 E: sales@freor.com www.freor.com DOM-3CX0X-X0000E_v1.1 FREOR LT is not affiliated with Chemours or FREON.
Need help?
Do you have a question about the PLUTON SPACE and is the answer not in the manual?
Questions and answers