Quick Start Guide: Counterpoint iD Installation Requirements What’s In The Box 1 CPiD Chassis 1 Power Supply Unit (PSU) Install kit including: 2 #8 hex head screws (5/8 inch long) 2 tie wraps 1 6-Pin connector Tools Required 1 small flathead screwdriver...
Page 4
Checkpoint Systems, Inc. 10073883 – Field Service Installation Document – CKP P/N Rear Input Power Connector Connector for +12V DC input power DC Jack Strain Relief Strain relief for power cord Internal Cabling exit Opening for all cables that connect internally (e.g., Antenna Cable)
Quick Start Guide: Counterpoint iD Alarm and Interlock Connection for Interlock and Alarm Interlock Description / Pin-out Interlocks are external Interlock Input. Default is shorted to Pin 2 using devices that relay wire jumper control signals to the device Interlock Opto, polarity independent (jumper must be removed prior to use).
Page 6
Checkpoint Systems, Inc. 10073883 – Field Service Installation Document – CKP P/N Status LED Functions Status LED Function Yellow Blue Teal White Violet Green Detection (Tag Alarm) Waiting for Interlock Keyswitch disabled AutoTune Blink Auto Tune Window 0.5s after reset is...
Page 7
Quick Start Guide: Counterpoint iD Mounting A secure location, such as behind an access door below the register, is ideal for mounting. Plan routing and location so the unit will not be struck by anything. When possible, locate unit such that user has ability to interface with device.
Checkpoint Systems, Inc. 10073883 – Field Service Installation Document – CKP P/N Wiring Procedure 1. Connect antenna cable(s) according to Table on page 2. Plug into ANT1 ANT2 connector, then route cable(s) through the clips for strain relief. Dog-bone excess antenna cable with provided tie wrap.
Page 9
See Also DMS version 1.8.95 and later will feature a help file to cover all SW-based configurations and settings for using CPiD. To access the instructions, click Help (or press F1) > Help Files > Counterpoint ID. Page 7 of 7...
Important Information to our Users in North America FCC Regulatory Compliance Statement Checkpoint Systems, Inc., offers Electronic Article Surveillance (EAS) or Radio Frequency Identification Products that have been FCC certified or verified to 47 CFR Part 15 Subparts B/C. Appropriately, one of the following labels will apply to the approval: NOTE: This equipment has been tested and found compliant within the limits for a class A digital device, pursuant to Part 15 of the FCC Rules.
Page 11
8” x 8” Equipment Compliance Statement Checkpoint’s Electronic Article Surveillance (EAS) products have been designed for safeness during normal use and, where applicable have been certified, listed, or recognized in accordance with one or more of the following safety standards; UL 60950-1, CSA C22.2 No. 60950-1-07. Additional approvals may be pending.
European Union. There are a number of obligations imposed on Checkpoint as a supplier of electrical and electronic equipment. Checkpoint's compliance approach for each of these obligations is provided below.
WEEE Marking All products that are subject to the WEEE Directive supplied by Checkpoint are compliant with the WEEE marking requirements. Such products are marked with the "crossed out wheelie bin" WEEE symbol shown below in accordance with European Standard EN 50419.
Need help?
Do you have a question about the Counterpoint iD and is the answer not in the manual?
Questions and answers