Section 11
Testing functionality by secondary injection
Test
equipment
IEC05000480 V4 EN-US
Figure 30:
Test
equipment
IEC05000481 V5 EN-US
Figure 31:
11.10.1.1
Testing the synchronizing function
The voltage inputs used are:
158
IED
U-Bus
U3PBB1
N
U-Line
U3PLN1
UL1
UL2
UL3
N
N
General test connection with three-phase voltage connected to the line side
IED
U-Bus1
U3PBB1
U-Bus2
U3PBB2
U-Line2
U3PLN2
U-Line1
U3PLN1
N
N
General test connection for a 1½ breaker diameter with one-phase voltage
connected to the line side
© 2017 - 2022 Hitachi Energy. All rights reserved
UMeasure
Ph/N
Ph/Ph
Input Phase
L1,L2,L3
L12,L23,L31
UMeasure
Ph/N
Ph/Ph
Input Phase
L1,L2,L3
L12,L23,L31
IEC05000480-4-en.vsd
UMeasure
Ph/N
N
Ph/Ph
Input Phase
N
L1,L2,L3
L12,L23,L31
N
UMeasure
Ph/N
Ph/Ph
Input Phase
L1,L2,L3
L12,L23,L31
IEC05000481-5-en.vsd
1MRK 511 403-UEN Rev. L
M2377-21 v8
Bay control REC670
Commissioning manual