Installation Manual
3P Smart Meter
IM-S2.3P-SMARTMETER-EN-V1.2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3P and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Autarco 3P

  • Page 1 Installation Manual 3P Smart Meter IM-S2.3P-SMARTMETER-EN-V1.2...
  • Page 2 This manual is an integral part of the unit. Please read the manual carefully before installation, operation or maintenance. Keep this manual for future reference. Product information is subject to change without notice. All trademarks are recognized as the property of their respective owners. © Autarco Group B.V. All rights reserved. IM-S2.3P-SMARTMETER-EN-V1.2...
  • Page 3: Table Of Contents

    1. Introduction 1.1 Read this first 1.2 Target Audience 1.3 Intended Application 2. Preparation 2.1 Safety instructions 3. Overview 3.1 Front Panel Display 4. Installation 4.1 Mounting the Consumption meter 4.2 Electrical Connections 4.3 Wiring 4.4 Monitoring 5. Specifications IM-S2.3P-SMARTMETER-EN-V1.2...
  • Page 4: Introduction

    1.3 Target Audience This manual is intended for anyone who installs or maintains Autarco inverters in conjunction with a 3-phase consumption meter (smart meter). Before any further action, the operators must first read all safety regulations and be aware of the potential danger to operate high-voltage devices. Operators must also have a complete understanding of this device’s features and functions.
  • Page 5: Intended Application

    Installation manual 1.4 Content of package 3P smart meter 3 CT clamps RS485-cable (3-phase consumption meter) + comm-connector + RJ45-connector Brand: ACREL Type: DTSD1352 1.5 Intended Application This manual applies to the following products; ● S2.3P-SMARTMETER Consumption meter for 3 phase inverters All current inverter models have the possibility of internal power export limitation using an external current clamp or consumption meter.
  • Page 6: Preparation

    Please contact your dealer to get the information of an authorized repair facility for any maintenance or repairmen. Any unauthorized actions including modification of product functionality of any form will affect the validation of warranty service; Autarco may deny the obligation of warranty service accordingly. IM-S2.3P-SMARTMETER-EN-V1.2...
  • Page 7: Overview

    Installation manual Overview 3.1 Front Panel Display Figure 3.1: Front panel display IM-S2.3P-SMARTMETER-EN-V1.2...
  • Page 8: Installation

    Installation 4.1 Mounting the smart meter The consumption meter needs to be installed in the meter cupboard and can be installed on a 35mm DIN rail. 4.2 Electrical Connections IM-S2.3P-SMARTMETER-EN-V1.2...
  • Page 9: Wiring

    Install the current clamps (CT clamps) on the phase cables that directs to the grid. Note the arrow on the current clamp and make sure it is installed in the right direction. Use port 21 and 22 on the meter to connect it to the meter port of the inverter. IM-S2.3P-SMARTMETER-EN-V1.2...
  • Page 10: Monitoring

    NOTE! The access to this area is for fully qualified and accredited technicians only. Enter menu “Advanced Info’ and “Advanced Settings” (password needed). ● Go to Advanced settings ● Enter password (contact Autarco Support for instructions) ● Select 24h Switch ● Set to ON and press ENTER ●...
  • Page 11: Specifications

    Installation manual Specifications Model name S2.3P-SMARTMETER Grid topology 3P+N Rated voltage 3 x 230V/400V Input current 3 x 1 (6) A (via CTs) Operating temperature -25°C - 55°C Relative humidity <95% (non-condensing) Dimension (L*W*H) 127L*70W*89H (mm) IM-S2.3P-SMARTMETER-EN-V1.2...