1. Foreword

1.1 First installation guide

1.1.1 Open-package checking

Please check all components according to the packing list to confirm the quantity and specification. Please
confirm the surface of modules, cables and accessories well.

1.1.2 Safety confirmation

Please read the manual in detail, and prepare the instruments and installation environment accordingly.

1.1.3 Environment confirmation

Please read the operating environment in detail. If the environment not suitable to your requirements,
please contact our service staff to get support.

1.1.4 Function Confirmation

Please read the system overview in detail to understand the function and interface of modules, cables
and accessories

1.1.5 Components Installation

Please read the installation guide carefully, installing the module after confirming the station of
hardware(please installing nearby, hardware would be installed near the batteries, charger or motor
controller).
*Notice: The fastening degree of hardware installation needs to meet the vibration and impact demand of
the application.

1.1.6 Cables installation

Please follow these steps to install the wire harness,
a)
Communication cables, control cables, temperature cables connection, ensure to cut off the power of
both high and low voltage circuit, connecting the module communication cables, control cables (relay,
switch signal, CAN-bus of charge& discharge), temperature sensor cables and current sensor cables
b)
Voltage collection cables connection, connect the voltage collection cables to cells orderly according
to the system diagram and labels. After confirming all cables connected with correct order(very
important), please connect the other side to module
c)
Insulation detection cables, high voltage detection cables connection (optional accessories), connect
the cables of insulation detection, high voltage detection and divider, and connect the other side after
confirm all cables connected correctly
d)
After all of the cables connected, please check each cable according to the system diagram to ensure
all cables connected correctly and reliably.
*Notice:
All connectors should be locked before connecting the detection cables
Check the insulation of connectors; avoid conductive impurity such as water, dust, or metal particles.
Ensure to cut off the power of high and low voltage circuits before all cables connected correctly

1.1.7 Adjusting confirmation

After all of the components connected correctly, BMS could connect to power. Observing the display
information and relay state, if error happens, please check whether the module and cables connected
correctly or not. If connected correctly, please contact our service staff to get support.

1.1.8 Power-on test

Chapter 2 Product Manual